Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133A912 + (14:11:51, 12 December 2024)
- ML20133A913 + (14:11:51, 12 December 2024)
- ML20133A911 + (14:11:52, 12 December 2024)
- ML20133A910 + (14:11:53, 12 December 2024)
- ML20133A908 + (14:11:54, 12 December 2024)
- ML20133A907 + (14:11:55, 12 December 2024)
- ML20133A905 + (14:11:58, 12 December 2024)
- BVY-96-165, Informs That Following Satisfactory Completion of Testing, Issuance of Procedure Revs & Training of Personnel,New Low Pressure Fire Protection Sys Will Be Declared Functional + (14:11:59, 12 December 2024)
- ML20133A901 + (14:12:00, 12 December 2024)
- ML20133A902 + (14:12:00, 12 December 2024)
- ML20133A900 + (14:12:01, 12 December 2024)
- ML20133A897 + (14:12:02, 12 December 2024)
- ML20133A896 + (14:12:03, 12 December 2024)
- ML20133A893 + (14:12:06, 12 December 2024)
- ML20133A891 + (14:12:07, 12 December 2024)
- ML20133A892 + (14:12:07, 12 December 2024)
- ML20133A889 + (14:12:08, 12 December 2024)
- PNO-V-85-050, on 850726,while Preparing to Cool Down from 55-day Hot Functional Test Run,Alarm Received That Breaker Control Switch Operated W/O Authorization from Remote to Local Position.Cause Under Investigation + (14:12:09, 12 December 2024)
- ML20133A887 + (14:12:10, 12 December 2024)
- ML20133A884 + (14:12:11, 12 December 2024)
- ML20133A882 + (14:12:11, 12 December 2024)
- ML20133A880 + (14:12:12, 12 December 2024)
- ML20133A877 + (14:12:13, 12 December 2024)
- ML20133A875 + (14:12:14, 12 December 2024)
- ML20133A873 + (14:12:14, 12 December 2024)
- ML20133A871 + (14:12:15, 12 December 2024)
- B16117, Completes 961018 Commitment to Identify Specific Design/ Operation Mod Required to Be Made to Ensure Availability of SBO Generator Any Time During Postulated 8 H Loop by 961231 + (14:12:17, 12 December 2024)
- ML20133A866 + (14:12:17, 12 December 2024)
- ML20133A859 + (14:12:18, 12 December 2024)
- ML20133A857 + (14:12:19, 12 December 2024)
- ML20133A855 + (14:12:23, 12 December 2024)
- ML20133A852 + (14:12:24, 12 December 2024)
- ML20133A851 + (14:12:25, 12 December 2024)
- ML20133A846 + (14:12:26, 12 December 2024)
- BECO-LTR-96-108, Forwards Rev 11D of Pilgrim Nuclear Power Station Colr + (14:12:27, 12 December 2024)
- 05000250/LER-1985-015-01, :on 850626,voluntary Unit Cooldown Initiated Using Guidance of Tech Spec 3.0.1 Due to Detection of RCS Leak.Cause of 850625 Reactor Vessel O-ring Leakage Still Under Investigation + (14:12:30, 12 December 2024)
- ML20133A840 + (14:12:31, 12 December 2024)
- ML20133A838 + (14:12:32, 12 December 2024)
- ML20133A830 + (14:12:33, 12 December 2024)
- NRC-96-0105, Loss of Shutdown Cooling Due to Inadvertent Closing of Residual Heat Removal Pump Shutdown Cooling Inboard Containment Isolation Valve Due to Interruption of Valve Control Logic + (14:12:35, 12 December 2024)
- ML20133A823 + (14:12:38, 12 December 2024)
- ML20133A824 + (14:12:38, 12 December 2024)
- ML20133A821 + (14:12:39, 12 December 2024)
- ML20133A819 + (14:12:40, 12 December 2024)
- ML20133A820 + (14:12:40, 12 December 2024)
- ML20133A818 + (14:12:41, 12 December 2024)
- ML20133A815 + (14:12:42, 12 December 2024)
- ML20133A813 + (14:12:43, 12 December 2024)
- 05000456/LER-1996-013-06, :on 961205,area Radiation Monitor Setpoints Were Incorrect.Caused by Personnel Error Due to Inadequate Work Practices & Inattention to Detail.Effectiveness Review of These CAs Will Be Performed + (14:12:45, 12 December 2024)
- ML20133A811 + (14:12:46, 12 December 2024)
- ML20133A810 + (14:12:46, 12 December 2024)
- ML20133A809 + (14:12:47, 12 December 2024)