Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133C902 + (13:53:09, 12 December 2024)
- ML20133C901 + (13:53:10, 12 December 2024)
- ML20133C894 + (13:53:11, 12 December 2024)
- ML20133C898 + (13:53:11, 12 December 2024)
- ML20133C892 + (13:53:12, 12 December 2024)
- ML20133C889 + (13:53:13, 12 December 2024)
- 05000295/LER-1985-025-04, :on 850627,after Taking Unit off-line for Repairs to Feedwater Regulating Valve,Control Rod Failure Received.Operator Manually Tripped Reactor.Caused by Phase Error in Group B.Alarm Reset + (13:53:16, 12 December 2024)
- ML20133C884 + (13:53:17, 12 December 2024)
- ML20133C880 + (13:53:18, 12 December 2024)
- AECM-85-0210, Bldg on Strengths,Mississippi Power & Light Co 1984 Annual Rept. Financial Statements Encl + (13:53:19, 12 December 2024)
- ML20133C876 + (13:53:20, 12 December 2024)
- ML20133C875 + (13:53:21, 12 December 2024)
- ML20133C874 + (13:53:22, 12 December 2024)
- ML20133C870 + (13:53:23, 12 December 2024)
- ML20133C871 + (13:53:23, 12 December 2024)
- 2CAN078502, Forwards Amend 3 to Updated FSAR for Arkansas Nuclear One Unit 2 + (13:53:24, 12 December 2024)
- ML20133C867 + (13:53:24, 12 December 2024)
- ML20133C863 + (13:53:25, 12 December 2024)
- IR 05000302/1984033 + (13:53:26, 12 December 2024)
- ML20133C860 + (13:53:30, 12 December 2024)
- ML20133C857 + (13:53:31, 12 December 2024)
- ML20133C854 + (13:53:32, 12 December 2024)
- ML20133C853 + (13:53:32, 12 December 2024)
- IR 05000456/1985035 + (13:53:34, 12 December 2024)
- 05000346/LER-1985-014, :on 850605,Door 318 Determined No Longer Functional Due to Irreparable Damage.Caused by Mods to Door Bottom Resulting from Installation of Temporary Water Line. New Door Will Be Installed by 850930 + (13:53:36, 12 December 2024)
- ML20133C849 + (13:53:37, 12 December 2024)
- BSEP-96-0479, Requests Withdrawal of 961231 Commitment Completion Date for Upgrade Project for Intermediate Range Monitors + (13:53:38, 12 December 2024)
- ML20133C847 + (13:53:38, 12 December 2024)
- ML20133C840 + (13:53:40, 12 December 2024)
- ML20133C839 + (13:53:40, 12 December 2024)
- ML20133C838 + (13:53:41, 12 December 2024)
- ML20133C837 + (13:53:42, 12 December 2024)
- 05000331/LER-1985-023, :on 850702,reactor Water Cleanup Sys Isolated as Result of Momentary Spurious Signal in Leak Detection Instrumentation.Again on 850713 & 15,sys Isolated Due to Procedural Deficiency.Procedural Rev Initiated + (13:53:45, 12 December 2024)
- ML20133C833 + (13:53:46, 12 December 2024)
- ML20133C823 + (13:53:47, 12 December 2024)
- ML20133C826 + (13:53:47, 12 December 2024)
- IR 05000482/1996025 + (13:53:49, 12 December 2024)
- ML20133C818 + (13:53:49, 12 December 2024)
- PNO-II-97-001, on 970107,portable Gauge Containing 8 Mci of Cs-137 & 40 Mci of Am-241 Beryllium Was Reported Stolen. State of Fl Is Following Incident & Is Working W/Local Authorities to Develop Press Release + (13:53:50, 12 December 2024)
- ML20133C817 + (13:53:50, 12 December 2024)
- ML20133C812 + (13:53:51, 12 December 2024)
- IR 05000010/1996013 + (13:53:56, 12 December 2024)
- IR 05000269/1985029 + (13:53:57, 12 December 2024)
- ML20133C808 + (13:53:58, 12 December 2024)
- ML20133C805 + (13:53:59, 12 December 2024)
- 05000327/LER-1996-012-01, :on 960330,two Cold Leg Accumulator Sample Isolation Valves & Missing Data Sheet in Surveillance Package Were Inoperable.Caused by LCO Not Being Entered. Isolation Valves Were Tested + (13:54:01, 12 December 2024)
- ML20133C801 + (13:54:02, 12 December 2024)
- ML20133C795 + (13:54:03, 12 December 2024)
- ML20133C796 + (13:54:03, 12 December 2024)
- ML20133C790 + (13:54:04, 12 December 2024)
- ML20133C789 + (13:54:05, 12 December 2024)
- ML20133C788 + (13:54:06, 12 December 2024)