Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138B378 + (01:08:39, 12 December 2024)
- ML20138B377 + (01:08:40, 12 December 2024)
- ML20138B371 + (01:08:43, 12 December 2024)
- ML20138B370 + (01:08:44, 12 December 2024)
- ML20138B367 + (01:08:45, 12 December 2024)
- 05000325/LER-1997-003-02, :on 970321,response Time Test Elimination Occurred.Caused by Personnel Error.Procedure Changes Required to Implement TS Amend Will Be Completed + (01:08:47, 12 December 2024)
- ML20138B362 + (01:08:48, 12 December 2024)
- ML20138B364 + (01:08:48, 12 December 2024)
- ML20138B361 + (01:08:49, 12 December 2024)
- ML20138B359 + (01:08:50, 12 December 2024)
- ML20138B357 + (01:08:51, 12 December 2024)
- ML20138B356 + (01:08:52, 12 December 2024)
- ML20138B355 + (01:08:52, 12 December 2024)
- ML20138B353 + (01:08:53, 12 December 2024)
- NSD-NRC-97-5079, Forwards AP600 SSAR Markups That Identify Changes Required to Implement Isolation Requirements for Normal Residual Heat Removal Sys + (01:08:54, 12 December 2024)
- ML20138B352 + (01:08:54, 12 December 2024)
- HL-5333, Informs That Second Phase of Power Uprate Addressed to NRC Will Be Made This Summer & Will Request New Licensed Power of 2763 Mwt or 108% of Plant Current Limit of 2558 Mwt. Review of post-LOCA Dose Methodology & Results,Requested + (01:08:58, 12 December 2024)
- IR 05000440/1985082 + (01:08:59, 12 December 2024)
- ML20138B347 + (01:09:00, 12 December 2024)
- ML20138B342 + (01:09:02, 12 December 2024)
- ML20138B341 + (01:09:02, 12 December 2024)
- ML20138B339 + (01:09:03, 12 December 2024)
- ML20138B338 + (01:09:04, 12 December 2024)
- ML20138B337 + (01:09:04, 12 December 2024)
- ML20138B331 + (01:09:05, 12 December 2024)
- 05000409/LER-1985-016, :on 850914,fuse Supplying Control Room Instrumentation from Noninterruptible Bus 1B Blew,Causing Reactor Scram on High Water Level.Caused by Technician Error.Fuse Replaced + (01:09:07, 12 December 2024)
- ML20138B326 + (01:09:08, 12 December 2024)
- B11792, Forwards Responses to Questions Re Draft Tech Specs.Info Provided Re Justification for Min Secondary Side Steam Generator Water Level of 10% in Specs 3/4.4.1.2,3/4.4.1.3 & 3/4.4.1.4 + (01:09:09, 12 December 2024)
- ML20138B324 + (01:09:09, 12 December 2024)
- ML20138B323 + (01:09:11, 12 December 2024)
- ML20138B319 + (01:09:12, 12 December 2024)
- ML20138B322 + (01:09:12, 12 December 2024)
- ML20138B317 + (01:09:13, 12 December 2024)
- ML20138B316 + (01:09:13, 12 December 2024)
- ML20138B315 + (01:09:14, 12 December 2024)
- ML20138B314 + (01:09:15, 12 December 2024)
- ML20138B312 + (01:09:15, 12 December 2024)
- ML20138B309 + (01:09:16, 12 December 2024)
- ML20138B306 + (01:09:20, 12 December 2024)
- ML20138B305 + (01:09:21, 12 December 2024)
- ML20138B304 + (01:09:21, 12 December 2024)
- ML20138B302 + (01:09:22, 12 December 2024)
- U-600326, Provides Description of Drywell Vacuum Relief Valves & Position Indication & Requests Closure of License Condition 4 as Stated in SER (NUREG-0854) Section 7.3.2.3. Valves Allow Movement of Containment Air Into Drywell + (01:09:22, 12 December 2024)
- ML20138B298 + (01:09:23, 12 December 2024)
- JAFP-85-0808, Monthly Operating Rept for Sept 1985 + (01:09:24, 12 December 2024)
- ML20138B296 + (01:09:24, 12 December 2024)
- NRC-97-0045, Forwards Diskette Containing Data for 1996 Rept of Individual Monitoring,Per 10CFR20.2206.W/o Encl + (01:09:25, 12 December 2024)
- ML20138B293 + (01:09:26, 12 December 2024)
- ML20138B291 + (01:09:26, 12 December 2024)
- ML20138B287 + (01:09:27, 12 December 2024)
- ML20138B289 + (01:09:27, 12 December 2024)