Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Press Release-13-074, NRC Issues Final Safety Evaluation Report for Davis-Besse License Renewal Application + (10:44:33, 11 January 2025)
- GNRO-2013/00066, Criticality Safety Analysis License Amendment Request - Supplemental Information + (10:44:37, 11 January 2025)
- LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual + (10:44:37, 11 January 2025)
- 05000323/LER-2013-005, Regarding Unit 2 Reactor Trip Due to Lightning Arrester Flashover + (10:44:40, 11 January 2025)
- NRC 2013-0074, Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i) Response to Request for Additional Information + (10:44:41, 11 January 2025)
- NRC 2013-0084, CFR 50.55a Request, Relief Request RR-4L1, Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval Response to Request for Additional Information + (10:44:44, 11 January 2025)
- RS-13-092, License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure + (10:44:47, 11 January 2025)
- ML13249A207 + (10:44:48, 11 January 2025)
- IR 05000407/2013201 + (10:44:49, 11 January 2025)
- ML13249A189 + (10:44:49, 11 January 2025)
- ML13249A167 + (10:44:51, 11 January 2025)
- ML13249A166 + (10:44:52, 11 January 2025)
- ML13249A164 + (10:44:53, 11 January 2025)
- ML13249A160 + (10:44:55, 11 January 2025)
- ML13249A078 + (10:44:55, 11 January 2025)
- RA13-044, Triennial Chlorine Survey Report + (10:44:56, 11 January 2025)
- L-2013-227, Extended Power Uprate Cycle 27 Startup Report-Supplement 1 + (10:44:57, 11 January 2025)
- ML13249A075 + (10:45:01, 11 January 2025)
- ML13249A060 + (10:45:02, 11 January 2025)
- ML13249A056 + (10:45:03, 11 January 2025)
- ML13249A030 + (10:45:04, 11 January 2025)
- ML13249A029 + (10:45:04, 11 January 2025)
- RNP-RA/13-0089, Supplemental Submittal to Correct TS Pages Re Request for Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection & Application of Permanent Alternate Repair Criteria + (10:45:05, 11 January 2025)
- ML13249A027 + (10:45:06, 11 January 2025)
- ML13249A011 + (10:45:06, 11 January 2025)
- OI 4-2012-010, Closure of Investigation (OI 4-2012-010) + (10:45:07, 11 January 2025)
- ML13249A000 + (10:45:09, 11 January 2025)
- ML13248A628 + (10:45:10, 11 January 2025)
- ML13248A640 + (10:45:10, 11 January 2025)
- ML13248A611 + (10:45:11, 11 January 2025)
- ML13248A603 + (10:45:12, 11 January 2025)
- ML13248A600 + (10:45:12, 11 January 2025)
- ML13248A598 + (10:45:13, 11 January 2025)
- ML13248A596 + (10:45:14, 11 January 2025)
- Press Release-13-072, NRC Schedules 12 Meetings Nationwide on Waste Confidence Proposed Rule and Environmental Study + (10:45:14, 11 January 2025)
- ML13248A594 + (10:45:16, 11 January 2025)
- ML13248A593 + (10:45:17, 11 January 2025)
- ML13248A532 + (10:45:18, 11 January 2025)
- RS-13-227, Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate + (10:45:19, 11 January 2025)
- JAFP-13-0036, Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act and License Amendment Request + (10:45:20, 11 January 2025)
- ML13248A516 + (10:45:21, 11 January 2025)
- ML13248A495 + (10:45:22, 11 January 2025)
- ML13248A496 + (10:45:22, 11 January 2025)
- ML13248A492 + (10:45:23, 11 January 2025)
- ML13248A457 + (10:45:24, 11 January 2025)
- ML13248A456 + (10:45:24, 11 January 2025)
- L-2013-244, Reactor Vessel Material Surveillance Program - Revised Surveillance Capsule Withdrawal Schedule for X4 + (10:45:25, 11 January 2025)
- 05000324/LER-2013-004, Regarding Operation Prohibited by Technical Specifications - Recirculation Loop Flow Mismatch + (10:45:27, 11 January 2025)
- 05000250/LER-2013-008, Regarding Through-Wall Leak in 3A CCW Pump Threaded Fitting Caused Pump to Be Inoperable Longer than AOT + (10:45:30, 11 January 2025)
- L-2013-237, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report + (10:45:31, 11 January 2025)
- 05000423/LER-2013-005, Regarding Loss of Containment Integrity Due to Failed Airlock + (10:45:39, 11 January 2025)