Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14069A534 + (03:47:40, 11 January 2025)
- ML14069A517 + (03:47:41, 11 January 2025)
- ML14069A522 + (03:47:41, 11 January 2025)
- ML14069A516 + (03:47:42, 11 January 2025)
- ML14069A510 + (03:47:46, 11 January 2025)
- ML14069A506 + (03:47:46, 11 January 2025)
- ML14069A500 + (03:47:47, 11 January 2025)
- 05000483/LER-2014-002, Regarding Operation Outside of Pressure and Temperature Limit Report Curve Required by Technical Specification 3.4.3 + (03:47:49, 11 January 2025)
- ML14069A491 + (03:47:50, 11 January 2025)
- ML14069A480 + (03:47:50, 11 January 2025)
- ML14069A477 + (03:47:54, 11 January 2025)
- ML14069A476 + (03:47:55, 11 January 2025)
- ML14069A468 + (03:47:55, 11 January 2025)
- ML14069A467 + (03:47:56, 11 January 2025)
- L-MT-14-015, Plants Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (03:47:57, 11 January 2025)
- 05000334/LER-2014-002, Regarding Turbine Driven Auxiliary Feedwater Pump Governor Oscillations Result in Pump Trip + (03:48:01, 11 January 2025)
- 05000334/LER-2014-001, Regarding Beaver Valley Unit 1 Automatic Reactor Trip Due to Main Unit Transformer Failure + (03:48:04, 11 January 2025)
- IR 05000269/2014403 + (03:48:05, 11 January 2025)
- ML14069A457 + (03:48:05, 11 January 2025)
- ML14069A442 + (03:48:06, 11 January 2025)
- ML14069A447 + (03:48:06, 11 January 2025)
- ML14069A437 + (03:48:07, 11 January 2025)
- IR 05000331/2014404 + (03:48:08, 11 January 2025)
- L-14-105, Notification of Impracticality for the Third 10-Year Inservice Inspection Interval + (03:48:08, 11 January 2025)
- ML14069A417 + (03:48:09, 11 January 2025)
- W3F1-2012-0029, Registration of Cask Use + (03:48:12, 11 January 2025)
- W3F1-2011-0027, Update to Response to NRC Order EA-10-092 Regarding Independent Spent Fuel Storage Installations (ISFSI) + (03:48:13, 11 January 2025)
- W3F1-2012-0039, Notification of Registration Cask Use + (03:48:13, 11 January 2025)
- ML14069A410 + (03:48:14, 11 January 2025)
- ML14069A394 + (03:48:15, 11 January 2025)
- ML14069A409 + (03:48:15, 11 January 2025)
- ML14069A388 + (03:48:16, 11 January 2025)
- ML14069A392 + (03:48:16, 11 January 2025)
- ML14069A387 + (03:48:17, 11 January 2025)
- ML14069A383 + (03:48:18, 11 January 2025)
- ML14069A382 + (03:48:18, 11 January 2025)
- ML14069A349 + (03:48:19, 11 January 2025)
- 05000285/LER-2014-001, Regarding Reactor Shutdown Due to Sluice Gate Failure + (03:48:21, 11 January 2025)
- ML14069A337 + (03:48:22, 11 January 2025)
- ML14069A344 + (03:48:22, 11 January 2025)
- ML14069A331 + (03:48:23, 11 January 2025)
- ML14069A319 + (03:48:24, 11 January 2025)
- ML14069A320 + (03:48:24, 11 January 2025)
- ML14069A318 + (03:48:25, 11 January 2025)
- ML14069A309 + (03:48:26, 11 January 2025)
- NL-14-032, Supplemental Information to Proposed Changes to Indian Point 2 Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Over Pressure Requirements Indian Point Unit Number 2 + (03:48:27, 11 January 2025)
- ML14069A307 + (03:48:27, 11 January 2025)
- 05000272/LER-2014-001, Regarding High Energy Line Break Door Blocked Open During Maintenance Activity + (03:48:29, 11 January 2025)
- IR 05000305/2013011 + (03:49:01, 11 January 2025)
- ML14069A184 + (03:49:01, 11 January 2025)
- ML14069A181 + (03:49:02, 11 January 2025)
- ML14069A180 + (03:49:03, 11 January 2025)