Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-1505, Forwards Response to Draft Ser/Fsar Item F 6.2-31 Re Containment Isolation & Containment Leakage.Encl mark-ups of FSAR Pages Will Be Incorporated in Future FSAR Amend + (23:37:22, 11 December 2024)
- ML20138N432 + (23:37:23, 11 December 2024)
- ST-HL-AE-1474, Forwards Response to Draft SER & FSAR Items,Including Flood Protection & UHS.Marked-up FSAR Pages Will Be Incorporated in FSAR Amend + (23:37:23, 11 December 2024)
- ML20138N429 + (23:37:24, 11 December 2024)
- 05000029/LER-1985-005-01, :on 851115,during Fire Hazard Analysis Review, Fire Barrier Between Turbine Bldg & Switchgear Room Deemed Inadequate.Caused by Inadequate Design.New Wall Installed on 851127 + (23:37:26, 11 December 2024)
- ML20138N425 + (23:37:28, 11 December 2024)
- ML20138N422 + (23:37:29, 11 December 2024)
- ML20138N414 + (23:37:30, 11 December 2024)
- ML20138N411 + (23:37:30, 11 December 2024)
- ML20138N408 + (23:37:31, 11 December 2024)
- ML20138N403 + (23:37:32, 11 December 2024)
- ST-HL-AE-1449, Forwards Addl Info on Draft SER or FSAR Items,Including Description & Drawings of Areas of Concentrated Cables & Fire Protection + (23:37:33, 11 December 2024)
- ML20138N394 + (23:37:34, 11 December 2024)
- ML20138N393 + (23:37:35, 11 December 2024)
- ML20138N390 + (23:37:36, 11 December 2024)
- ML20138N388 + (23:37:36, 11 December 2024)
- GO2-85-409, Responds to Concerns Identified in 850702 Telcon Re Graphic Display Sys & Emergency Dose Protection Sys.Alternative Means of Differentiating Real & Test Data Being Explored. Plant Computer Updated to Improve Response Time + (23:37:37, 11 December 2024)
- ML20138N383 + (23:37:37, 11 December 2024)
- DCL-85-328, Forwards Diablo Canyon Power Plant Semiannual Radioactive Effluent Release Rept,Supplemental Info Jan-June 1985 in Response to NRC 850930 Request for Dose Assessment Info + (23:37:38, 11 December 2024)
- ML20138N376 + (23:37:39, 11 December 2024)
- ML20138N375 + (23:37:40, 11 December 2024)
- ST-HL-AE-1502, Forwards Chapter 3 marked-up Pages,To Draft Ser/Fsar Item Q10.002-1 Re Flood Protection.Pages Will Be Incorporated in Future FSAR Amend + (23:37:41, 11 December 2024)
- ML20138N370 + (23:37:41, 11 December 2024)
- ML20138N365 + (23:37:42, 11 December 2024)
- ML20138N360 + (23:37:43, 11 December 2024)
- ML20138N358 + (23:37:43, 11 December 2024)
- A04832, Forwards Response to IE Bulletin 80-11 Re Masonry Wall Design.Three Walls Qualified Using Energy Balance Techniques.All Three Walls Reanalyzed Using Linear Elastic Working Stress Method + (23:37:44, 11 December 2024)
- ML20138N355 + (23:37:44, 11 December 2024)
- ML20138N353 + (23:37:45, 11 December 2024)
- ML20138N350 + (23:37:46, 11 December 2024)
- ML20138N349 + (23:37:46, 11 December 2024)
- ML20138N347 + (23:37:47, 11 December 2024)
- ML20138N348 + (23:37:47, 11 December 2024)
- ML20138N344 + (23:37:48, 11 December 2024)
- ML20138N340 + (23:37:49, 11 December 2024)
- ML20138N336 + (23:37:49, 11 December 2024)
- ML20138N335 + (23:37:50, 11 December 2024)
- IR 05000269/1985030 + (23:37:51, 11 December 2024)
- ML20138N332 + (23:37:51, 11 December 2024)
- ML20138N330 + (23:37:52, 11 December 2024)
- ST-HL-AE-1511, Forwards Responses to NRC 851025 Questions & Comments on Fire Hazards Analysis Rept.Encl Includes marked-up Pages Which Will Be Incorporated in Future Fire Hazards Analysis Rept Amend + (23:37:53, 11 December 2024)
- ML20138N325 + (23:37:54, 11 December 2024)
- IR 05000395/1985042 + (23:37:55, 11 December 2024)
- ML20138N319 + (23:37:56, 11 December 2024)
- ML20138N321 + (23:37:56, 11 December 2024)
- ML20138N318 + (23:37:57, 11 December 2024)
- ML20138N317 + (23:37:57, 11 December 2024)
- ML20138N313 + (23:37:58, 11 December 2024)
- A05255, Forwards Comments on Draft Rept Re Probabilistic Safety Study & Util Risk Based Evaluations of Integrated Safety Assessment Program Topics,Per NRC 850923 Request + (23:37:59, 11 December 2024)
- ML20138N305 + (23:38:00, 11 December 2024)
- ML20138N308 + (23:38:00, 11 December 2024)
- ML20138N304 + (23:38:01, 11 December 2024)