Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155C881 + (03:06:11, 11 December 2024)
- ML20155C879 + (03:06:12, 11 December 2024)
- NRC-88-0069, Forwards Summary of Completed Preoperational Testing of Solid Radwaste Sys.Results Indicate Significant Reduction in Sys Throughout for Bead Resin & Ecodex Precoat Matls & Appear Consistent W/Similar Sys in Nuclear Industry + (03:06:13, 11 December 2024)
- ML20155C878 + (03:06:13, 11 December 2024)
- ML20155C876 + (03:06:14, 11 December 2024)
- RBG-28012, Special Rept:On 880503,invalid Failure of Division II Diesel Generator (DG) Occurred.Caused by Circuit Breaker Serving Ventilation Exhaust Fan 1HVP*FN2B Failure to Close.Subj Breaker Loosened from Binding,Tested & Reinstalled + (03:06:15, 11 December 2024)
- ML20155C869 + (03:06:16, 11 December 2024)
- ML20155C870 + (03:06:16, 11 December 2024)
- IR 05000483/1988007 + (03:06:19, 11 December 2024)
- ML20155C865 + (03:06:20, 11 December 2024)
- ML20155C862 + (03:06:21, 11 December 2024)
- ML20155C863 + (03:06:21, 11 December 2024)
- ML20155C860 + (03:06:22, 11 December 2024)
- ML20155C858 + (03:06:24, 11 December 2024)
- ML20155C856 + (03:06:25, 11 December 2024)
- 05000373/LER-1986-002-01, :on 860120,Wyle Lab Test Results Determined That Main Steam Safety Relief Valves E,H & U Failed to Meet Setpoint Tolerance Per Tech Specs.Caused by Seat Leakage. Valve Setpoints Adjusted to Nameplate + (03:06:33, 11 December 2024)
- ML20155C853 + (03:06:34, 11 December 2024)
- ML20155C852 + (03:06:34, 11 December 2024)
- ML20155C851 + (03:06:35, 11 December 2024)
- ML20155C844 + (03:06:36, 11 December 2024)
- ML20155C846 + (03:06:36, 11 December 2024)
- ML20155C842 + (03:06:37, 11 December 2024)
- ML20155C836 + (03:06:38, 11 December 2024)
- ML20155C834 + (03:06:42, 11 December 2024)
- ML20155C830 + (03:06:43, 11 December 2024)
- ML20155C833 + (03:06:43, 11 December 2024)
- B12916, Provides Info Re Schedule for Cycle 10 Reload & Related Safety Analysis Submittals.Nrc Notification Requested by 880630 of Any Significant Obstacles in Obtaining Issuance of License Amend by 880630 + (03:06:44, 11 December 2024)
- ML20155C829 + (03:06:44, 11 December 2024)
- ML20155C823 + (03:06:45, 11 December 2024)
- ML20155C821 + (03:06:49, 11 December 2024)
- ML20155C818 + (03:06:50, 11 December 2024)
- ML20155C819 + (03:06:50, 11 December 2024)
- PNO-IV-88-081, on 880930,two of Eight Solenoid Operated Valves Failed During Test of MSIVs Per Info Notice 88-043. Reactor Shutdown Commenced from 4 to 7 Days + (03:06:51, 11 December 2024)
- ML20155C816 + (03:06:51, 11 December 2024)
- ST-HL-AE-2797, Forwards Documentation Re Review of City of Austin Vs Houston Lighting & Power & Houston Industries.Encl Describes Scope & Methodology of Program Initiated on 880725.NRC Participation in Litigation Review Program Welcomed + (03:06:52, 11 December 2024)
- ML20155C812 + (03:06:53, 11 December 2024)
- ML20155C811 + (03:06:54, 11 December 2024)
- HBL-88-055, Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination + (03:06:55, 11 December 2024)
- ML20155C806 + (03:06:55, 11 December 2024)
- ML20155C800 + (03:06:56, 11 December 2024)
- ML20155C798 + (03:06:57, 11 December 2024)
- ML20155C795 + (03:06:57, 11 December 2024)
- ML20155C794 + (03:06:58, 11 December 2024)
- ML20155C789 + (03:06:59, 11 December 2024)
- ML20155C788 + (03:06:59, 11 December 2024)
- ML20155C786 + (03:07:00, 11 December 2024)
- ML20155C781 + (03:07:01, 11 December 2024)
- ML20155C783 + (03:07:01, 11 December 2024)
- ML20155C779 + (03:07:02, 11 December 2024)
- ML20155C775 + (03:07:03, 11 December 2024)
- ML20155C777 + (03:07:03, 11 December 2024)
- ML20155C774 + (03:07:04, 11 December 2024)