- NL-16-1050, Seventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) + (02:07:51, 10 January 2025)
- NL-16-083, Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3 + (02:07:52, 10 January 2025)
- ML16221A393 + (02:07:53, 10 January 2025)
- ML16221A392 + (02:07:54, 10 January 2025)
- ML16221A391 + (02:07:56, 10 January 2025)
- DCL-16-077, Pacific Gas and Electric Companys Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) for Diablo Canyon Power Plant Un + (02:07:59, 10 January 2025)
- ML16221A389 + (02:08:02, 10 January 2025)
- NL-16-1051, Seventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) + (02:08:03, 10 January 2025)
- IR 05000354/2016002 + (02:08:20, 10 January 2025)
- ML16221A380 + (02:08:25, 10 January 2025)
- ML16221A378 + (02:08:28, 10 January 2025)
- Press Release-16-048, NRC Names David Nelson as Chief Information Officer + (02:08:30, 10 January 2025)
- NLS2016047, Dam Failure Modeling White Paper in Regard to Nuclear Regulatory Commission Interim Staff Response to Reevaluated Flood Hazards + (02:08:33, 10 January 2025)
- ML16221A347 + (02:08:35, 10 January 2025)
- IR 05000277/2016002 + (02:09:01, 10 January 2025)
- L-MT-16-037, ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I + (02:09:04, 10 January 2025)
- ML16221A275 + (02:10:52, 10 January 2025)
- ML16221A274 + (02:11:01, 10 January 2025)
- ML16221A273 + (02:11:02, 10 January 2025)
- LIC-16-0058, Intent to Comply with ASME Code Case N-729-1, Alternative Examination Requirements for PWR Reactor Vessel Upper Heads with Nozzles Having Pressure-Retaining Partial-Penetration Welds Section XI, Division 1, as Written + (02:11:03, 10 January 2025)
- 05000390/LER-2016-010, Regarding Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado + (02:12:07, 10 January 2025)
- L-16-254, Supplement to Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 2-TYP-3-BN-01) + (02:12:10, 10 January 2025)
- ML16221A165 + (02:12:13, 10 January 2025)
- IR 05000220/2016002 + (02:12:27, 10 January 2025)
- ML16221A084 + (02:12:31, 10 January 2025)
- NL-16-1329, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.0 + (02:12:33, 10 January 2025)
- ML16221A061 + (02:12:35, 10 January 2025)
- RC-16-0126, License Amendment Request - LAR-16-03130 Change of the Completion Date of Implementation Milestone 8 + (02:12:37, 10 January 2025)
- ONS-2016-071, Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change + (02:12:47, 10 January 2025)
- ML16221A004 + (02:12:49, 10 January 2025)
- ML16221A003 + (02:12:50, 10 January 2025)
- ML16221A002 + (02:12:51, 10 January 2025)
- ML16221A001 + (02:12:52, 10 January 2025)
- IR 05000482/2016002 + (02:13:50, 10 January 2025)
- IR 05000313/2016405 + (02:13:53, 10 January 2025)
- ML16218A488 + (02:13:55, 10 January 2025)
- ML16218A485 + (02:13:59, 10 January 2025)
- ML16218A483 + (02:14:02, 10 January 2025)
- 05000296/LER-2016-006, Regarding High Pressure Coolant Injection System Found to Be Inoperable During Testing + (02:15:11, 10 January 2025)
- ML16218A472 + (02:15:13, 10 January 2025)
- IR 05000443/2016002 + (02:15:30, 10 January 2025)
- 05000387/LER-2015-013-01, Regarding Loss of Differential Pressure in Zone I of Secondary Containment Due to Solenoid Valve Failure + (02:16:47, 10 January 2025)
- ML16218A390 + (02:16:51, 10 January 2025)
- IR 05000382/2016002 + (02:16:59, 10 January 2025)
- ML16218A367 + (02:17:00, 10 January 2025)
- IR 05000528/2016002 + (02:17:21, 10 January 2025)
- IR 05000413/2016404 + (02:17:23, 10 January 2025)
- IR 05000285/2016002 + (02:17:31, 10 January 2025)
- IR 05000282/2016002 + (02:17:41, 10 January 2025)
- IR 05000313/2016009 + (02:17:48, 10 January 2025)
- L-16-201, Firstenerqy Nuclear Operating Companys (Fenocs) Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (02:17:51, 10 January 2025)