Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196G890 + (21:18:05, 10 December 2024)
- ML20196G891 + (21:18:05, 10 December 2024)
- ML20196G888 + (21:18:06, 10 December 2024)
- ML20196G889 + (21:18:06, 10 December 2024)
- ML20196G886 + (21:18:08, 10 December 2024)
- ML20196G882 + (21:18:08, 10 December 2024)
- ML20196G881 + (21:18:12, 10 December 2024)
- ML20196G878 + (21:18:13, 10 December 2024)
- ML20196G880 + (21:18:13, 10 December 2024)
- 05000309/LER-1988-002-01, :on 880115,unlocked ECCS Valves Not Properly Controlled Per Tech Specs.Caused by Misinterpretation of Tech Specs.Tech Spec Change Under Evaluation + (21:18:15, 10 December 2024)
- ML20196G874 + (21:18:16, 10 December 2024)
- ML20196G873 + (21:18:17, 10 December 2024)
- IR 05000361/1998012 + (21:18:18, 10 December 2024)
- ML20196G870 + (21:18:18, 10 December 2024)
- ML20196G867 + (21:18:20, 10 December 2024)
- ML20196G865 + (21:18:21, 10 December 2024)
- ML20196G864 + (21:18:22, 10 December 2024)
- ML20196G861 + (21:18:22, 10 December 2024)
- ML20196G860 + (21:18:23, 10 December 2024)
- 05000265/LER-1987-003-09, :on 870127,discovered That HPCI Motor Speed Changer Would Not Travel to High Speed Stop.Caused by Misadjustment of Relay 2330-105 7 & 8 Contacts.Contacts Adjusted to within Proper Gap Settings + (21:18:25, 10 December 2024)
- ML20196G857 + (21:18:26, 10 December 2024)
- ML20196G854 + (21:18:27, 10 December 2024)
- ML20196G855 + (21:18:27, 10 December 2024)
- ML20196G853 + (21:18:28, 10 December 2024)
- NRC-97-0068, Monthly Operating Rept for June 1997 for Fermi,Unit 2 + (21:18:28, 10 December 2024)
- ML20196G850 + (21:18:29, 10 December 2024)
- RC-97-0143, Monthly Operating Rept for June 1997 for VC Summer Nuclear Station + (21:18:30, 10 December 2024)
- ML20196G849 + (21:18:30, 10 December 2024)
- ML20196G847 + (21:18:31, 10 December 2024)
- 0CAN079706, Monthly Operating Repts for June 1997 for Arkansas Nuclear One,Units 1 & 2 + (21:18:32, 10 December 2024)
- ML20196G844 + (21:18:32, 10 December 2024)
- ML20196G842 + (21:18:33, 10 December 2024)
- ML20196G840 + (21:18:34, 10 December 2024)
- ML20196G839 + (21:18:34, 10 December 2024)
- ML20196G835 + (21:18:35, 10 December 2024)
- ML20196G833 + (21:18:36, 10 December 2024)
- ML20196G834 + (21:18:36, 10 December 2024)
- 05000443/LER-1996-008, :on 961212,potential Loss of Automatic Actuation of EFWS Discovered.Caused by Limiting Single Failure of B Train Ssps Was Not Considered in Design of Efws.Operability Determination Was Performed + (21:18:39, 10 December 2024)
- ML20196G830 + (21:18:40, 10 December 2024)
- ML20196G829 + (21:18:41, 10 December 2024)
- 05000265/LER-1987-002-11, :on 870122,RCIC Turbine Outboard Bearing Flooded W/Oil & Turbine Inboard Oil Level Was Too Low.Caused by Mod Design Deficiency.Defective Bearing Replaced & Maint Procedure Will Be Developed + (21:18:43, 10 December 2024)
- 05000265/LER-1987-020-07, :on 871210,reactor Scram Occurred Due to Turbine/Generator Load Mismatch.Caused by Component Failure. Failed Solenoid Replaced & No Further Corrective Action Deemed Necessary + (21:18:48, 10 December 2024)
- ML20196G821 + (21:18:49, 10 December 2024)
- 05000265/LER-1987-018-06, :on 871104,HPCI Sys Auto Isolation Due to High Temp in HPCI Room.Caused by Design Deficiency in HPCI Room Temp Monitoring Sys.Sys Evaluated & Mod 4-1(2)-84-21 Proposed + (21:18:51, 10 December 2024)
- 05000302/LER-1997-007, :on 970306,building Temperature Variations Larger than Assumed Resulting in Unknown Instrument Uncertainties Was Discovered.Caused by Lack of Commitment. Established Ambient Temperature Requirements + (21:18:56, 10 December 2024)
- 05000265/LER-1987-015-09, :on 871102,off-gas Isolation Timer Declared Inoperable Following Testing.Caused by Equipment Failure Due to Motor end-of-life.Unit Two off-gas Timer Replaced W/Unit One Timer & Functionally Tested Satisfactorily + (21:18:58, 10 December 2024)
- 3F0797-32, Documents Initiatives Taken Since Early 1996 to Address Issues Associated W/Departures from Plant Fsar.Brief Synopsis of Findings & Description of Comprehensive CAs in Process as Part of Present Restart Effort + (21:18:59, 10 December 2024)
- 05000265/LER-1987-014-09, :on 871101,480-volt Transformer 29 to 480-volt Bus 29 Circuit Breaker Tripped.Caused by Apparent Overload Condition.Possible Malfunction of Circuit Breaker Further Investigated & Procedure Qop 6700-2 Revised + (21:19:12, 10 December 2024)
- ML20196G807 + (21:19:13, 10 December 2024)
- 05000443/LER-1996-004, :on 960627,EFWS Valve Closure Occurred.Caused by Insufficient 10CFR50.59 Refresher Training.Revised 10CFR50.59 Evaluation Procedure + (21:19:15, 10 December 2024)
- 05000265/LER-1987-013-09, :on 871019,reactor Scram & ECCS Initiations & Related Actuations Occurred.Caused by Personnel Error. Disciplinary Action Administered,Procedures Revised,Training Sessions Held & Circuit Breakers Inspected + (21:19:17, 10 December 2024)
- ML20196G802 + (21:19:18, 10 December 2024)