Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199G026 + (12:39:13, 10 December 2024)
- ML20199G023 + (12:39:14, 10 December 2024)
- ML20199G024 + (12:39:14, 10 December 2024)
- LIC-98-0011, Forwards Revised Section 10.0, On-site Results for Analysis to Support Removal of FCS Toxic Gas Monitoring Sys, Originally Attachment 2 to 950109 Application for Amend to License,Per Discussions W/Nrc + (12:39:15, 10 December 2024)
- NPL-99-0031, Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr + (12:39:16, 10 December 2024)
- ML20199G019 + (12:39:16, 10 December 2024)
- ML20199G015 + (12:39:18, 10 December 2024)
- ML20199G014 + (12:39:18, 10 December 2024)
- ML20199G011 + (12:39:19, 10 December 2024)
- ML20199G013 + (12:39:19, 10 December 2024)
- ML20199G007 + (12:39:20, 10 December 2024)
- ML20199G010 + (12:39:20, 10 December 2024)
- ML20199G006 + (12:39:21, 10 December 2024)
- NSD-NRC-97-5438, Forwards 3 Copies of W Responses to NRC RAIs 440.731-440.734,relating to AP600 MSSV TS 3.7.2.W Status for Open Item Tracking Sys Item 5998-6001 Are Action N.Status for Item 4464 Is Confirm W to Track Pending SSAR & TS Rev + (12:39:22, 10 December 2024)
- ML20199G004 + (12:39:25, 10 December 2024)
- ML20199G002 + (12:39:25, 10 December 2024)
- ML20199G001 + (12:39:26, 10 December 2024)
- ML20199F999 + (12:39:27, 10 December 2024)
- ML20199F996 + (12:39:28, 10 December 2024)
- ML20199F995 + (12:39:28, 10 December 2024)
- ML20199F993 + (12:39:29, 10 December 2024)
- ML20199F991 + (12:39:30, 10 December 2024)
- ML20199F990 + (12:39:31, 10 December 2024)
- ML20199F989 + (12:39:31, 10 December 2024)
- ML20199F988 + (12:39:32, 10 December 2024)
- ML20199F986 + (12:39:33, 10 December 2024)
- 05000289/LER-1998-014-01, :on 981210,missed TS Surveillance Was Noted. Caused by Human Error.Absolute & Relative Control Rod Positions Were Obtained Immediately & Verified to Agree within Required Range.With + (12:39:35, 10 December 2024)
- ML20199F981 + (12:39:36, 10 December 2024)
- 05000352/LER-1986-015, :on 860304,main Control Room Ventilation Sys Isolated & Train B of Control Room Emergency Fresh Air Sys Started.Caused by Breakage of Chlorine Analyzer Tape D. Chlorine Detection Sys Temporarily Installed + (12:39:37, 10 December 2024)
- ML20199F979 + (12:39:38, 10 December 2024)
- ML20199F977 + (12:39:39, 10 December 2024)
- ML20199F975 + (12:39:40, 10 December 2024)
- IR 05000373/1997013 + (12:39:42, 10 December 2024)
- ML20199F969 + (12:39:43, 10 December 2024)
- ML20199F967 + (12:39:44, 10 December 2024)
- NOC-AE-000398, Notifies NRC That Assessments of Effects of Fuel Rod Internal Pressure on 17% Oxidation Criterion of 10CFR50.46 Will Continue for Future Refueling Cycles Until Industry Issue Is Resolved + (12:39:44, 10 December 2024)
- 05000373/LER-1986-019-02, :on 860521,RCPB Pipe Leaks Found Coming from RHR Loop Injection Piping.Possibly Caused by Entrapped Slag or Other Defect in Plug Seal Weld.Coupling Will Be Capped + (12:39:46, 10 December 2024)
- ML20199F962 + (12:39:47, 10 December 2024)
- ML20199F961 + (12:39:47, 10 December 2024)
- 05000322/LER-1986-013, :on 860305,fire Watch in Relay Room Found Asleep.Caused by Personnel Error.Individual Terminated + (12:39:49, 10 December 2024)
- ML20199F958 + (12:39:50, 10 December 2024)
- ML20199F959 + (12:39:50, 10 December 2024)
- ML20199F957 + (12:39:51, 10 December 2024)
- 05000413/LER-1998-018-01, :on 981214,identified That There No Single Procedure That Specifically Verified Response Time for Two SI RT Functions.Caused by Inadequate Procedures.Procedures Will Be Revised &/Or Developed.With + (12:39:53, 10 December 2024)
- ML20199F953 + (12:39:54, 10 December 2024)
- TXX-4855, Interim Deficiency Rept CP-86-37 Re Class 1E Battery Charger Firing Board Assemblies & Amplifier Boards Not Conforming to Vendor Assembly Drawings.Evaluation Continuing.Next Rept Will Be Submitted by 860716 + (12:39:54, 10 December 2024)
- ML20199F949 + (12:39:55, 10 December 2024)
- ML20199F951 + (12:39:55, 10 December 2024)
- SVP-98-377, Provides Summary of NRC Commitments Completed During 15th Refueling outage,Q1R15 + (12:39:56, 10 December 2024)
- CY-98-005, Forwards Volumes 1-3 to Decommissioning UFSAR, Which Accurately Presents Changes Completed Since Previous Submittal.Ufsar Will Be Updated IAW 10CFR50.71(e)(4),as Plant Continues to Recategorize Structures,Sys & Components + (12:39:57, 10 December 2024)
- 05000286/LER-1986-002-01, :on 860518,during Main Turbine Vibration Test, Reactor Tripped on Steam Flow/Feedwater Flow Mismatch Signal.Caused by Air Caught in Flow Transmitters Due to Insufficient Blowdown.Operators Counseled + (12:39:59, 10 December 2024)