Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19320A965 + (23:44:55, 1 January 2025)
- ML19320A964 + (23:44:56, 1 January 2025)
- ML19320A963 + (23:44:57, 1 January 2025)
- 05000298/LER-1980-014-03, /03L-0:on 800518,while Performing Sp 6.3.13.1, Relay 14A-K2B Was Found de-energized,preventing Start of Core Spray Pump on Normal Power.Superflous Contacts Were Inadvertently Left Connected in Core Spray Pump Circuits + (23:44:58, 1 January 2025)
- 05000298/LER-1980-014, Forwards LER 80-014/03L-0 + (23:45:00, 1 January 2025)
- ML19320A959 + (23:45:01, 1 January 2025)
- ML19320A958 + (23:45:02, 1 January 2025)
- 05000259/LER-1980-047-03, /03L-0:on 800604,during Power Operation,While Testing Drywell Air Sampling Sys,Vacuum Pump Associated W/ RM-1-90-256 Failed.Caused by Normal Wear.Pump Was Replaced + (23:45:04, 1 January 2025)
- ML19320A954 + (23:45:05, 1 January 2025)
- ML19320A952 + (23:45:06, 1 January 2025)
- ML19320A951 + (23:45:06, 1 January 2025)
- 05000259/LER-1980-047, Forwards LER 80-047/03L-0 + (23:45:07, 1 January 2025)
- ML19320A948 + (23:45:08, 1 January 2025)
- ML19320A947 + (23:45:09, 1 January 2025)
- 05000259/LER-1980-046-03, /03L-0:on 800605,during Power Operation,While Performing Surveillance Test,Core Spray Pump Discharge Pressure switch,PS-75-44,exceeded Setpoint.Caused by Instrument Drift.Switch Was Inspected,Calibr & Tested + (23:45:11, 1 January 2025)
- ML19320A945 + (23:45:12, 1 January 2025)
- 05000267/LER-1980-029-03, /03L-0:on 800602,at Approx 60% Power,Reactor Bldg Pressure Could Not Be Maintained Subatmospheric.Caused by Frozen Air Line to Reactor Bldg Louver Pneumatic Actuator Due to Liquid Nitrogen Proximity + (23:45:14, 1 January 2025)
- 05000298/LER-1980-012-03, /03L-0:on 800521,during Local Leak Rate Test,Nine Penetrations Found Leaking Excessively.Caused by Normal Wear.Seal Ring Replaced,Seats Polished,Packing Tightened & Ring Seal Cleaned + (23:45:15, 1 January 2025)
- 05000259/LER-1980-046, Forwards LER 80-046/03L-0 + (23:45:17, 1 January 2025)
- ML19320A939 + (23:45:19, 1 January 2025)
- ML19320A938 + (23:45:20, 1 January 2025)
- 05000259/LER-1980-045-03, /03L-0:on 800602,at 80% Power,Hpci Failed to Meet Flow Requirements Because Turbine Stop Valve Tripped.Caused by Worn Mechanical Overspeed Trip Piston.New Parts Installed & Tested + (23:45:21, 1 January 2025)
- ML19320A936 + (23:45:22, 1 January 2025)
- 05000298/LER-1980-012, Forwards LER 80-012/03L-0 + (23:45:24, 1 January 2025)
- ML19320A933 + (23:45:25, 1 January 2025)
- 05000259/LER-1980-045, Forwards LER 80-045/03L-0 + (23:45:26, 1 January 2025)
- ML19320A929 + (23:45:27, 1 January 2025)
- 05000327/LER-1980-085-01, /01T-0:on 800530,during Review of EGTS & ABGTS Equipment Qualifications,Sys Solenoid Valves Found Rated for 77 F Normal Svc Temp.Ambient Temp May Reach 104 F.Cause Not Stated.New Valves Being Purchased + (23:45:29, 1 January 2025)
- 05000267/LER-1980-029, Forwards LER 80-029/03L-0 + (23:45:31, 1 January 2025)
- 05000327/LER-1980-040-01, /01T-0:on 800531,upon Preoperational Testing of Safety Injection Pumps,Found That 6,900-volt Breakers Would Lockout,Preventing Pump Start.Cause Unknown.Problem Is Being Evaluated + (23:45:32, 1 January 2025)
- ML19320A924 + (23:45:33, 1 January 2025)
- ML19320A922 + (23:45:34, 1 January 2025)
- ML19320A923 + (23:45:34, 1 January 2025)
- 05000327/LER-1980-040, Forwards LER 80-040/01T-0 + (23:45:36, 1 January 2025)
- TXX-3156, Advises That Upgraded Emergency Plan for Facility Will Be Submitted by 800930 + (23:45:36, 1 January 2025)
- 05000327/LER-1980-085, Forwards LER 80-085/01T-0 + (23:45:39, 1 January 2025)
- 05000312/LER-1980-030-03, /03L-0:on 800623,while Performing I-108C,reactor Protection Sys Channel C Test,Overpower Bistable Voltage Setting Was Found Drifted Out of Spec.Caused by Malfunctioning of Semiconductor Voltage Regulator + (23:45:41, 1 January 2025)
- ML19320A914 + (23:45:42, 1 January 2025)
- ML19320A912 + (23:45:43, 1 January 2025)
- 05000312/LER-1980-030, Forwards LER 80-030/03L-0 + (23:45:45, 1 January 2025)
- 05000293/LER-1980-027-03, /03L-0:on 800605,stack Gas Grab Sample Pump P143 Tripped.Caused by Binding in Pump Due to Accumulation of Dirt.Pump Refurbished & Returned to Svc + (23:45:47, 1 January 2025)
- ML19320A906 + (23:45:49, 1 January 2025)
- 05000293/LER-1980-027, Forwards LER 80-027/03L-0 + (23:45:50, 1 January 2025)
- 05000293/LER-1980-026-03, /03L-0:on 800603,reactor Scram Initiated by Reactor Low Water Level Switches of Reactor Protection Sys. NRC Not Notified within Required Time.Caused by Operations Personnel Error.Requirements re-emphasized + (23:45:52, 1 January 2025)
- 05000293/LER-1980-026, Forwards LER 80-026/03L-0 + (23:45:54, 1 January 2025)
- 05000293/LER-1980-025-03, /03L-0:on 800602,fire Detection Alarm from HPCI Quadrant Sounded in Control Room on Panel C-94.Roving Fire Patrol Initiated & Immediate Investigation Conducted.Caused by Leak at Flange on HPCI Drain Line Valve AO2301-29 + (23:45:55, 1 January 2025)
- ML19320A899 + (23:45:59, 1 January 2025)
- 05000255/LER-1980-019, Forwards LER 80-019/01T-0 + (23:46:01, 1 January 2025)
- 05000325/LER-1980-037-03, /03L-0:on 800528,during Containment Integrity Check,Required Negative Pressure Not Reached.Caused by Leaks in Pipe & Cable Penetrations & Steam Line Boots.Penetrations Repacked & Boots Replaced.Test Procedures Revised + (23:46:02, 1 January 2025)
- ML19320A894 + (23:46:04, 1 January 2025)
- 05000293/LER-1980-025, Forwards LER 80-025/03L-0 + (23:46:05, 1 January 2025)