Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18096A315 +
- ML18057B318 +
- ML20085E242 +
- ML20085D497 +
- ML20085D435 +
- ML20085D430 +
- ML20085D412 +
- ML20085D313 +
- ML20085D272 +
- ML20085D203 +
- ML20085D089 +
- ML20085D073 +
- ML20085D061 +
- ML20085C812 +
- ML20085C770 +
- ML20079P072 +
- ML20079J182 +
- ML20079J175 +
- ML20079J169 +
- ML20079H239 +
- ML20092G663 +
- ML20092A826 +
- ML20261K846 +
- L-91-268, Advises That Util,In Cooperation W/State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Emergency Plan on 911204.Exercise Will Involve Participation by Local & State Emergency Response Personnel +
- BECO-91-127, Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR +
- SNRC-1844, Advises That L Britt Replaces R Gutmann as Util Employee Authorized to Submit Fingerprints to NRC & to Receive Results Under Criminal History Program +
- NLS9100409, Application for Amend to License DPR-46,consisting of Proposed Change 76 to Tech Specs,Adding Operational & Surveillance Requirements for Primary Containment Hydrogen Concentration Analyzer,Per Generic Ltr 83-36 +
- ML23157A253 +
- 05000334/LER-1991-025, :on 910908,plant Computer Malfunction Rendered Axial Flux Difference Monitor Alarm Inoperable & Printer for P250 Failed.Caused by Computer Memory Allocation Problem. Control Room Personnel Trained +
- 05000423/LER-1991-024-01, :on 910905,discovered That Triaxial Peak Recording Accelerograph Range Outside TS Requirements for Seismic Monitoring Instrumentation.Caused by Procedural Deficiency.New Accelerograph Installed +
- 05000482/LER-1991-015, :on 910907 & 09,discovered That Dirty, Temporary Filter in Place on Intake to RHR Pump Room & Air Flow for Room Coolers Could Not Be Obtained.Caused by Procedural Inadequacy.Workers Counseled +
- ML20085D959 +
- ML20085D965 +
- ML20079J130 +
- ML20079J124 +
- ML20034H502 +
- IR 05000259/1991032 +
- B13942, Forwards Addl Info Related to EDG Monthly Surveillance Testing,Motor Overcurrent Alarms & Dc Sys Design Basis,Per 910930 Meeting to Discuss Findings from Electrical Distribution Sys Functional Insp 50-245/91-81 +
- 05000397/LER-1991-023, :on 910906,HPCS Sys Pump Suction Switchover from Condensate Storage Tanks to Suppression Pool Occurred During Maint Testing.Caused by Incomplete Planning & Scheduling.Operators Realigned HPCS Suction +
- 05000397/LER-1991-022, :on 910905,inboard RHR Sys Shutdown Cooling Supply Valve Automatically Isolated on High Suction Line Flow Signal.Caused by Instrumentation Drift.Sys Realigned & Loop B Placed Back in Svc +
- ML16131A549 +
- ML17348B186 +
- ML17306A215 +
- ML16341G508 +
- ML16148A563 +