Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038A489 +
- ML17056B479 +
- Press Release-91-139, NRC Advisory Committee on Reactor Safeguard to Meet in Bethesda, MD, November 7-9 +
- ML17306A474 +
- ML17306A472 +
- ML18096A339 +
- ML18153C800 +
- ML20086R911 +
- ML20086G583 +
- ML20086C614 +
- ML20086C608 +
- ML20079P942 +
- ML20079P031 +
- ML20079L979 +
- ML20079L885 +
- ML20079L629 +
- ML20079L567 +
- ML20079L458 +
- ML20079L435 +
- ML20079L266 +
- ML20079L256 +
- ML20079L233 +
- ML20079L225 +
- ML20079L136 +
- ML20079L081 +
- ML20079L071 +
- ML20091L051 +
- ML20091E214 +
- ML20091E185 +
- TAC:68548 +
- A09899, Responds to NRC Re Violations Noted in Safety Insp Rept 50-423/91-15 & 911002 Notice of Violation & Forwards Civil Penalty in Amount of $50,000.Design Change Implemented to Address Mussel Fouling +
- B13932, Forwards Request for Relief from ASME Section XI Inservice Insp Requirements for Performing Exams of Class 1,2 & 3 Components +
- ELV-03184, Special Rept 1-91-4:on 911001,DG 1B Was Shut Down Due to Oil Leak from Supply Line to Rocker Arms.Caused by Connection Not Being Sufficiently Retightened.Tap Setting Change Made for Unit 1 a Rat.Wiring Discrepancy for 140 Relay Corrected +
- JPN-91-061, Responds to Generic Ltr 89-04 Re Guidance on Developing Acceptable Inservice Testing (IST) Program.Requests That NRC Review Open Relief Requests by 920101 to Enable Util to Implement Rev 4 to IST During Next Refueling Outage +
- ST-HL-AE-3906, Application for Amends to Licenses NPF-76 & NPF-80,revising Updated Final Safety Analysis Rept for Extended Burnup Fuel. No Significant Impacts Associated W/Proposed Change & License Amend Will Have No Significant Effect of Environ +
- PY-CEI-NRR-1389, Proposed Tech Specs Tables 3.3.2-1 Re Isolation Actuation Instrumentation & 3.3.3-1 Re ECCS Actuation Instrumentation +
- PY-CEI-NRR-1390, Proposed Tech Specs Table 3.3.2-2, Reactor Water Cleanup Sys Isolation Actuation Instrumentation +
- PY-CEI-NRR-1379, Proposed Tech Specs 3.1.3.2, Control Rod Max Scram Insertion Times, Clarifying Under What Conditions Shutdown of Plant to Hot Shutdown Is Required +
- ML20266F402 +
- ML20265B163 +
- ML20101Q433 +
- 05000413/LER-1991-021, :on 911002,turbine Trip Resulting in Reactor Trip Occurred When Vendor Sprayed Water Into Electrical Box. Caused by Failure to Properly Seal Conduit Connectors. Connectors Sealed +
- 05000455/LER-1990-006, :on 910930,reactor Containment Fan Cooler 2C Low Speed Breaker Did Not Close.Caused by Miscommunication & Procedural Deficiency.Procedure Revised to Include Emergency Exit Section +
- 05000361/LER-1991-015-01, :on 911001,containment Purge Isolation Sys Train a Actuation Occurred While Performing Radiography. Cause Not Stated.Health Physics Procedures Modified & Training Will Be Conducted +
- ML20079N857 +
- ML20129H882 +
- IR 05000280/1991027 +
- IR 05000272/1991011 +
- ML18153C798 +
- L-91-303, Submits Rev 1 to 911029 Temporary Waiver of Compliance from TS 3.2.1.b, Axial Flux Difference to Clarify That ex-core Calibr Cannot Be Performed at Power Level Recommended in TS Table 4.3-1 +