Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13169A238 + (June 14, 2013)
- ML13168A561 + (June 14, 2013)
- ML13168A242 + (June 14, 2013)
- ML13165A391 + (June 14, 2013)
- ML13165A384 + (June 14, 2013)
- NL-13-1177, Supplemental Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS) + (June 14, 2013)
- NL-13-1225, Response to May 15, 2013 Request for Additional Information Concerning the Revision to the Technical Specifications Associated with the Pressure Temperature Limits Report + (June 14, 2013)
- NL-13-1230, Schedule for Response to Request for Information Regarding License Amendment Request Permitting Use of Risk Informed Completion Times + (June 14, 2013)
- ML13165A359 + (June 14, 2013)
- ML13165A302 + (June 14, 2013)
- ML13165A247 + (June 14, 2013)
- ML13165A102 + (June 14, 2013)
- ML13165A071 + (June 14, 2013)
- ML13164A136 + (June 14, 2013)
- ML13161A163 + (June 14, 2013)
- TAC:ME5244 + (June 14, 2013)
- NL-13-1257, FNP-2-ESP-0.2, Revision 16 - Farley Nuclear Plant Event Specific Procedure FNP-2 - ESP-0.2 Natural Circulation Cooldown to Prevent Reaction Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257 + (June 14, 2013)
- NL-13-1257, FNP-1-ESP-0.4, Revision 21 - Farley Nuclear Plant Event Specific Procedure FNP-1-ESP-0-4 Natural Circulation Cooldwn with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257 + (June 14, 2013)
- NL-13-1257, FNP-1-ESP-0.3, Revision 13 - Farley Nuclear Plant - Event Specific Procedure FNP-1 - ESP-0.3 - Natural Circulation Cooldown with Allowance Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257 + (June 14, 2013)
- NL-13-1257, FNP-1-ESP-.02, Revision 19 - Farley Nuclear Plant - Event Specific Procedure FNP-1- ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257 + (June 14, 2013)
- NL-13-1257, FNP-0-ESB-0.4, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.4- Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257 + (June 14, 2013)
- NL-13-1257, FNP-0-ESB-0.3, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.3 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257 + (June 14, 2013)
- NL-13-1257, FNP-0-ESB-0.2, Version 2.0 - Farley Nuclear Plant, Specific Background Document for FNP-1/2 - ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257 + (June 14, 2013)
- NL-13-1257, FNP-2-ESP-0.4, Revision 18 - Farley Nuclear Plant Event Specific Procedure FNP-2-ESP-0-4 Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257 + (June 14, 2013)
- ML14085A086 + (October 2, 2008)
- 05000285/LER-2013-009, Regarding Tornado Missile Vulnerabilities + (June 14, 2013)
- 05000388/LER-2013-001, Regarding Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 1 + (June 14, 2013)
- ML13179A458 + (June 14, 2013)
- ML14126A573 + (June 15, 2013)
- ML14126A569 + (June 15, 2013)
- ML14126A587 + (June 15, 2013)
- NRC-14-0035, Drawing LRA-M-N-2048, Rev. Aj, Diesel Fuel Oil System & Lube Oil System Division I RHR Complex + (June 15, 2013)
- NRC-14-0035, Drawing LRA-M-5358-1, Rev. 0, Reactor Building Closed Cooling Water + (June 15, 2013)
- NRC-14-0035, Drawing LRA-M-5449, Rev. T, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 2 of 2) + (June 15, 2013)
- ML13175A312 + (June 16, 2013)
- IR 05000387/2013008 + (June 17, 2013)
- ML13120A541 + (June 17, 2013)
- L-13-009, Response to NRC Letter Dated May 20. 2013, Diablo Canyon Power Plant Independent Spent Fuel Installation Storage Inspection Report 05000275-13-008, 05000323-13-008, 07200026-13-001 of Notice of Violation + (June 17, 2013)
- IR 05000454/2013301 + (June 17, 2013)
- ML13168A418 + (June 17, 2013)
- ML13156A266 + (June 17, 2013)
- TAC:L24750 + (June 17, 2013)
- ML13163A003 + (June 17, 2013)
- ML13168A432 + (June 17, 2013)
- ML13171A025 + (June 17, 2013)
- ML13176A117 + (June 17, 2013)
- TAC:MF2370 + (June 17, 2013)
- ML13074A760 + (June 17, 2013)
- ML13232A141 + (June 17, 2013)
- ML13232A140 + (June 17, 2013)
- ML13232A138 + (June 17, 2013)
- ML13232A137 + (June 17, 2013)
- ML13232A135 + (June 17, 2013)
- ML13232A134 + (June 17, 2013)
- ML13232A132 + (June 17, 2013)
- ML13232A131 + (June 17, 2013)