Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17264A201 +
- ML17264A205 +
- ML17263B077 +
- ML17332A802 +
- ML17332A800 +
- ML17332A801 +
- ML17332A799 +
- Press Release-95-075, Nuclear Industry Seeks Changes in NRC Fire Protection Requirements for Nuclear Power Plants +
- ML061870483 +
- ML18064A811 +
- ML18064A804 +
- ML18153A848 +
- ML20087C268 +
- ML20086A082 +
- ML20085M008 +
- ML20085L519 +
- ML20085L281 +
- ML20085L011 +
- ML20085J761 +
- ML20085J659 +
- ML20085J343 +
- ML20085J328 +
- ML20085J263 +
- ML20085J257 +
- ML20085H708 +
- ML20085H406 +
- ML20085H395 +
- ML20085H220 +
- ML20085G790 +
- ML20085G505 +
- ML20085G387 +
- ML20085G356 +
- ML20100G373 +
- ML20093D316 +
- ML20091G356 +
- ML20091G346 +
- ML20091G326 +
- ML20113G054 +
- ML20141J220 +
- ML20266H042 +
- ML20266B399 +
- ML20266B396 +
- LIC-95-0125, Forwards Monthly Operating Rept for May 1995 for Fort Calhoun Station & Revised Repts for Feb-Apr 1995 +
- NRC-95-0058, Responds to NRC ,Confirmimg That W/Listed Differences,Mods Described in Util Re Removal, Replacement & Reclassification of Thermo-Lag 300-1 Fire Barriers at Facility Implemented,Per GL 92-08 +
- LIC-95-0121, Responds to NRC Re Violation Noted in Insp Rept 50-285/95-04 on 950226-0408.Corrective Actions:Operating Procedure OP-11, Reactor Core Refueling Revised & Licensed Operators Instructed on Importance of Proper Communications +
- JPN-95-029, Forwards Application for Amend to License DPR-59,proposing Changes to Ts,To Extend Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycle +
- ML20266E037 +
- 05000263/LER-1995-005-01, :on 950518,two Main RB Supply Fans Tripped. Caused by Electrical Disturbance on 345 Kv Power Lines Connected to Plant Substation.Ventilation Configuration Changed +
- 05000352/LER-1995-002-01, :on 950221,dual Unit Scram Occurred Due to Offsite Electrical Transmission Disturbance.Changed Ground Fault Detection Relay Setttings for LGS Units 1 & 2 Main Transformers to Provide Better Coordination W/Sys Equipment +
- 05000220/LER-1995-003-01, :on 950516,discovered That Three I&C Sps Not Performed in Compliance W/Frequency in TS SRs Due to Cognitive Personnel Error.Missed Surveillances Performed & Affected I&C Procedures Will Be Revised +