Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25282A002 + (October 8, 2025)
- 05000277/LER-2025-001, Invalid Actuation Due to Bus Failure + (October 8, 2025)
- IR 05000482/2025301 + (October 8, 2025)
- ML25280A089 + (October 8, 2025)
- ML25280A085 + (October 8, 2025)
- ML25280A084 + (October 8, 2025)
- ML25281A316 + (October 8, 2025)
- ML25281A197 + (October 8, 2025)
- ML25280A062 + (October 8, 2025)
- L-2025-162, Periodic Update of the Updated Final Safety Analysis Report, Chapter 12, General + (October 9, 2025)
- NL-25-0390, Proposed Inservice Inspection Alternative FNP-ISI-ALT-2025-10 for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements in Accordance with 10 CFR 50.55a(z)(1) Response to Request for Additional Info + (October 9, 2025)
- LG-25-132, License Amendment and Alternative Request Related to One-Time Exception of Primary Containment Isolation Valve Testing + (October 9, 2025)
- 05000346/LER-2025-002, Cooldown to Mode 4 Not Completed in Required Time Due to Improper Procedure Routing + (October 9, 2025)
- ML25282A066 + (October 9, 2025)
- RA-24-0273, License Amendment Request to Revise Technical Specifications to Use Online Monitoring Methodology + (October 9, 2025)
- ML25280A050 + (October 9, 2025)
- RA-25-0210, Team Electric Plant, Units 1 and 2 - Notice of Intent to Pursue Subsequent License Renewal + (October 9, 2025)
- 05000346/LER-2025-001, Required Shutdown for Steam Generator Low Level Instrumentation Reference Leg Steam Leak + (October 9, 2025)
- ML25281A004 + (October 9, 2025)
- ML25279A004 + (October 9, 2025)
- ML25276A035 + (October 9, 2025)
- ULNRC-06977, Presentation Information for Pre-Application Meeting Regarding Transition to Advanced Westinghouse Fuel and Upgrade of Analytical Methods at Callaway Plant + (October 9, 2025)
- ML25281A008 + (October 9, 2025)
- ML25282A064 + (October 9, 2025)
- ML25281A003 + (October 9, 2025)
- ML25280A048 + (October 9, 2025)
- ML25276A033 + (October 9, 2025)
- NOC-AE-250041, Extension Request for Implementation of Order Approving Direct Transfer of Licenses + (October 10, 2025)
- PMNS20251162, Teams Call with TRISO-X, Llc. (TRISO-X) to Discuss Draft Responses to the Management Measures and Quality Assurance Request for Additional Information (RAI) Supplements + (October 10, 2025)
- 05000282/LER-2025-002, Control Room Chiller Inoperable Due to Purge System Failure + (October 10, 2025)
- LR-N25-0083, Supplement to License Amendment Requests to Adopt TSTF-505, TSTF-591, and 10 CFR 50.69 + (October 10, 2025)
- L-2025-171, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums + (October 13, 2025)
- 05000446/LER-2025-001, (Cpnpp), Containment Spray Pump Declared Inoperable Due to Misaligned Breaker + (October 13, 2025)
- L-2025-172, Submission of Periodic Reports + (October 13, 2025)
- ML25253A442 + (October 13, 2025)
- ML25266A016 + (October 14, 2025)
- ML25287A168 + (October 14, 2025)
- 05000348/LER-2025-001, Emergency Diesel 1C Unable to Achieve 110% of Maximum Load + (October 14, 2025)
- NL-25-0378, Core Operating Limits Report, Cycle 2 + (October 14, 2025)
- ML25287A025 + (October 14, 2025)
- 05000446/LER-2025-002, (Cpnpp), Safety Chiller Inoperable Due to Failure of Copper Refrigerant Fittings + (October 14, 2025)
- PMNS20251147, Hadron Energy Inc. Public Meeting to on Microreactor Fuel Qualification. Meeting Canceled Due to Government Shutdown! + (October 14, 2025)
- ML25282A071 + (October 14, 2025)
- ML25281A005 + (October 14, 2025)
- ML25287A003 + (October 14, 2025)
- ML25287A011 + (October 14, 2025)
- ML25280A049 + (October 14, 2025)
- ML25282A070 + (October 14, 2025)
- ML25276A034 + (October 14, 2025)
- ML25287A004 + (October 14, 2025)
- ML25281A007 + (October 14, 2025)
- ML25287A026 + (October 14, 2025)
- ML25287A002 + (October 14, 2025)
- ML25282A069 + (October 14, 2025)