Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 2013-16, Importance of Verification of Treatment Parameters for High Dose-Rate Remoter Afterloader Administrations +
- Information Notice 2012-16, Preconditioning of Pressure Switches Before Surveillance Testing +
- Information Notice 2009-16, Spurious Relay Actuations Result in Loss of Power to Safeguards Busses +
- Information Notice 2008-16, Summary of Fitness-for-Duty Program Performance Reports for Calendar Year 2007 +
- Information Notice 1984-16, Failure of Automatic Sprinkler System Valves to Operate +
- Information Notice 2005-16, Outage Planning and Scheduling - Impacts on Risk +
- Information Notice 1986-16, Failures to Identify Containment Leakage Due to Inadequate Local Testing of BWR Vacuum Relief System Valves +
- Information Notice 1990-16, Compliance with New Decommissioning Rule +
- Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown +
- Information Notice 1991-16, Unmonitored Release Pathways from Slightly Contaminated Recycle and Recirculation Water Systems at a Fuel Facility +
- Information Notice 1985-16, Time/Current Trip Curve Discrepancy of ITE/Siemens-Allis Molded Case Circuit Breaker +
- Information Notice 1989-16, Excessive Voltage Drop in DC Systems +
- Information Notice 1980-16, Shaft Seal Packing Causes Binding in Main Steam Swing Disc Check & Isolation Valves +
- Information Notice 1987-16, Degradation of Static O Ring Pressure Switches +
- Information Notice 1988-16, Identify Waste Generators in Shipments of Low-Level Waste to Land Disposal Facilities +
- Information Notice 1993-16, Failures of Not-Locking Devices in Check Valves +
- Information Notice 1994-16, Recent Incidents Resulting in Offsite Contamination +
- Information Notice 1995-16, Vibration Caused by Increased Recirculation Flow in a Boiling Water Reactor +
- Information Notice 1996-16, BWR Operation with Indicated Flow Less than Natural Circulation +
- Information Notice 1997-16, Preconditioning of Plant Structures, Systems, and Components Before ASME Code Inservice Testing or Technical Specification Surveillance Testing +
- Information Notice 1998-16, Inadequate Operational Checks of Alarm Ratemeters +
- Information Notice 2001-16, Recent Foreign and Domestic Experience with Degradation of Steam Generator Tube and Internals +
- Information Notice 2000-16, Volatilization of Radionuclides and Emergency Procedures +
- Information Notice 2010-16, Failure to Disable Unsafe Geometry Bandsaw Reservoir Results in Criticality Safety-Related Alert +
- Information Notice 2007-16, Common Violations of the Increased Controls Requirements and Related Guidance Documents +
- Information Notice 1999-16, Federal Bureau of Investigations Nuclear Site Security Program +
- Information Notice 2003-16, Icing Conditions Between Bottom of Dry Storage System and Storage Pad +
- Information Notice 2004-16, Tube Leakage Due to a Fabrication Flaw in a Replacement Steam Generator +