Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 40636 +
- 05000286/LER-2003-002, From Indian Point Unit 3 Regarding Manual Reactor Trip for Fire in Main Turbine Insulation Due to Rearing Oil Leak +
- ML12174A090 +
- ML17317B461 +
- ML18065A856 +
- ML20073J706 +
- ML20101Q910 +
- ML20093M138 +
- ML20091F253 +
- ML20107J282 +
- ML20085N503 +
- ML20108F216 +
- ML20136C071 +
- ML20141H425 +
- ML20133J573 +
- ML20112G482 +
- ML20203M169 +
- ML20357A054 +
- ML20217G782 +
- SNRC-1094, Forwards Detailed Info Re Test Duration,Strain Gauges,Test instrumentation,post-test Insp & Acceptance Criteria,Per Confirmatory Testing of Tdi Diesel Generators +
- ML20212G055 +
- ML20206K648 +
- 05000414/LER-1998-006-04, :on 981021,rod Control Sys Malfunction Occurred Due to Failed Card Leading to Manual Reactor Trip & Esf. Reactor Startup Was Suspended & Troubleshooting Efforts Were Initiated & Slave Cycler Lift Decoder Card Was Replaced +
- 05000265/LER-1997-001-07, :on 970227,instrument Maintenance Dept Was Performing Procedure to Test HPCI Initiation Logic.Caused by Deficient Procedure.Order Was Issued for All non-routine +
- 05000341/LER-1985-034, :on 850706,reactor Water Cleanup Sys Inboard & Outboard Primary Containment Isolation Valves Closed.Caused by Inadequate Instrument Loop Calibr Procedure.Procedure Revised.Loop Recalibr +
- 05000293/LER-1985-025, :on 850901,reactor Scram Occurred When Insulator in Switchyard Arced to Ground & Disintegrated. Caused by Salt Buildup Resulting from Storm.Insulator Replaced & Washdown Procedures Reviewed +
- 05000293/LER-1992-016, :on 921213,automatic Scram Resulting from Load Rejection Occurred While at 48 Percent Reactor Power.Caused by 345 Kv Switchyard Flashovers Due to Salt Deposited During Severe Coastal Storm +
- 05000272/LER-1985-003, :on 850214,turbine Stop Valve 12MS28 Limit Switch Malfunctioned,Causing Closed Signal to Solid State Protection Sys Train B.Caused by Personnel Judgement Error. Channel Repaired & Personnel Counseled +
- 05000293/LER-1991-024, :on 911030,loss of Preferred & Secondary Offsite Power Occurred Due to Severe Coastal Storm While Shut Down.Caused by Flashover Switchyard Insulator. Westinghouse Type Relay 62/5 Will Be Replaced +
- 05000293/LER-1990-008, :on 900513,automatic Scram Resulting from Load Rejection Occurred While at Full Power,Resulting in Trip of Generator Field Breakers.Caused by Fault on Offsite 345 Kv Transmission sys.Loss-of-field Relay Replaced +
- 05000293/LER-1993-004, :on 930313,automatic Scram Occurred Resulting from Load Rejection During Severe Coastal Storm While at 100% Power.Caused by Environ Effects of Storm.Trip Settings of Main Input Circuit Breakers Increased +
- ML20024B588 +
- ML20024C821 +
- ML20117L495 +
- ML20024B242 +
- ML19322C981 +
- ML19317H515 +
- ML19302E819 +
- ML19309E477 +
- 05000315/LER-1997-007-01, :on 970405,determined That SG Pressure Indications in CR Had Been Isolated Since 970329.Caused by Procedure Inadequacy.Revised SG Isolation Methodology Contained in Refueling Integrity Surveillance +
- ML19317H396 +
- ML20024B243 +
- 05000265/LER-1997-001-01, :on 970227,initiation of High Pressure Coolant Injection Occurred Due to Deficient Procedures.Will Revise Surveillance Procedures,Will Review Prerequisites of All Im Procedures & Will Communicate Mgt Expectations to Personne +
- 05000499/LER-1995-006-01, :on 950905,failure to Fully Meet Requirements of TSs Occurred Due to Not Placing Control Room Envelope HVAC Sys in Required Mode.Individual Involved Counseled.W/ +