Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17317B269 +
- ML18025B137 +
- ML031630964 +
- ML20091D776 +
- ML20115F047 +
- ML20148K982 +
- ML20132B100 +
- ML20150E058 +
- ML20196F429 +
- 0CAN109806, Monthly Operating Repts for Sept 1998 for ANO Units 1 & 2. with +
- RBG-22713, Unusual Event Rept:On 851126,ECCS Initiation Occurred.Caused by Receipt of Level 2 Signal from Level Instrumentation. Personnel Instructed That All Steps in Sys Test Procedures Must Be Followed +
- ML21239A071 +
- 05000440/LER-1992-017, :on 920910,RPS Scram Occurred Due to Reactor Water Level Reaching Level 3 Setpoint of 178 Inches.Oil Filter Gasket for RFPT B Servo Valve Inspected & Replaced.W/ +
- 05000311/LER-1983-053-99, /99X-0:on 830812,while Increasing RCS Pressure to 2,000 Psig,Both Pressurizer Spray Valves Opened & RCS Pressure Started to Decrease.Probably Caused by Pressure Control manual-auto Loading Station +
- 05000331/LER-1984-008, :on 840123,facility Experienced Reactor Scram While in Normal Run Mode.Caused by Power Supply Failure. Reactor Maintained in Hot Shutdown Until Reactor Startup Corrected +
- 05000322/LER-1993-002, :on 931228,fire in Primary Containment Occurred Which Required Evaluation & off-site Fire Department Assistance.Caused by Uncovered Opening in Bioshield Wall in Slag Path.Procedures Revised +
- ML20033F239 +
- IR 05000338/1980019 +
- 05000387/LER-2013-007, Regarding Loss of Secondary Containment Due to Drawdown Test Failure +
- 05000445/LER-2012-002, For Comanche Peak, Regarding Failure of Safety Related Breaker Control Devices Due to a Common Cause +
- 05000354/LER-1997-031, :on 971130,automatic Isolation Signal Was Noted During warm-up of RCIC Sys.Caused by Spurious Steam Line Pressure perturbations.Re-set Isolation Signal & Completed warm-up of RCIC Steam Lines +
- 05000341/LER-1997-007, :on 970325,condition Prohibited by TS Due to Failure of Reactor Building Hvac.East RBHVAC Exhaust & Supply Fans Were Started in Order to Reestablish Secondary Containment Integrity & Failed Solenoid Valve Replaced +
- 05000346/LER-1982-050-03, /03L-0:on 820921,breaker BE106 Opened,Causing MCCE12A to de-energize.Caused by Momentary Ground Due to Failure of Essential Pressurizer Heater (UB3-2).Maint Work Order 82-2433 Issued +