Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000237/LER-2001-002 +
- IR 05000247/2010005 +
- 05000247/FIN-2010005-07 +
- ML13109A234 +
- ML18141A274 +
- ML19325C287 +
- ML18219D352 +
- ML20073N010 +
- ML20070Q770 +
- ML20094G203 +
- ML20129G389 +
- ML20069D921 +
- ML20150A629 +
- ML20247H599 +
- IR 05000293/1989004 +
- ML20210K582 +
- 1CAN098608, Monthly Operating Rept for Aug 1986 +
- NL-88-881, Monthly Operating Rept for Jul 1988 for Rancho Seco Unit 1 +
- ML20246G186 +
- BVY-97-098, Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station +
- RBG-43-503, Forwards Nonroutine Repts Sent to Other Agencies,Per App B (Environ Protection Plan) to River Bend Station License NPF-47 +
- 05000280/LER-1985-007, :on 850429,turbine/reactor Trip Occurred as Result of Main Feed Pump a Trip.Caused When Valve Open Signal Not Sent to Feed Pump Trip Logic.Valve Position Actuator Arm Modified +
- 05000382/LER-1996-006-01, :on 960517,reactor Trip Occurred.Caused by Failed Component & Original Design Inadequacies.Replaced Both Motor/Generator (M/G) Set Overvoltage Relays & Replaced a M/G Set Voltage Regulator +
- 05000373/LER-1995-014-02, :on 950816,reactor Scram Occurred Due to 1D RPS Trip Causing Group 1 Isolation.Upgrade Model of EPM Assembly Logic Cards Installed on Both Unit 1 RPS Motor Generator Sets & Upper Main Steam Tunnel Switches Calib +
- 05000293/LER-1992-006, :on 920411,unplanned RPS Scram Signal Occurred While Plant Shut Down.Caused by Licensed Operator Error. RPS Circuitry Reset on 920411 & post-scram Recovery Procedure Will Be Strengthened +
- 05000272/LER-1981-083-03, Svc Water Leak Noticed from Bottom of Reducing Tee Near Supply Valve 12SW913 to Charging Pump 12 Oil Cooler.Caused by Internal Corrosion & Erosion in Reducing Tee.Tee Replaced & Pump Tested +
- 05000272/LER-1981-083, Forwards Corrected LER 81-083/03X-1.Detailed Event Analysis Encl +
- ML19351A286 +
- 05000280/LER-1990-002-02, :on 900315,containment Vacuum Pump Auto Started But Tripped Immediately.Caused by Binding of Pump Internals Due to Moisture Accumulation.New Pump Installed.Pumps Will Be Inspected on Periodic Basis +
- 05000272/LER-1991-027, :on 910815,two Partial Mode Op I 1A Safeguard Equipment Control Cabinet Signal Actuations Occurred.Caused by Equipment Failure.Chassis Replaced & Failed Cards Sent to Mfg +
- 05000260/LER-1998-001-02, :on 980308,ESF Actuations Occurred When 2B RPS Bus Was Transferred to de-energized Source.Caused by Failure of Preparing Clearance to Exercise Proper Attention. 2B RPS Bus Restored to Transformer Source +
- 05000397/LER-1993-010, :on 940304,24 Reportable Problems Identified by Failure of Procedures to Fully Implement.Cause Was Less than Adequate Barrier & Controls for Program Changes.Corrective Actions Include Procedure & TS Changes +
- ML18152A309 +
- 05000354/LER-2005-004, A Control Room Emergency Filtration (CREF) Train Inoperable with B CREF Out of Service +
- 05000338/LER-2003-003, For North Anna Power Station, Unit 1 Regarding Manual Reactor Trip Due to Loss of Electro Hydraulic Control System Pressure +
- ML19269C897 +
- ML18142A503 +
- ML18153C160 +
- 05000293/LER-1998-014, :on 980622,identified Potential Degraded Grid Voltage Condition.Caused by Misunderstanding of Regulatory Guidelines.Engineering Evaluation Ee 98-0055 Prepared to Address Discrepancy in Timing of Restoring Emergency Power +
- 05000293/LER-1997-015, :on 971104,SSW Pump Overload Setting Was Too Low for Single SSW Pump Operation W/Degraded Voltage.Caused by Variation in SSW Pump BHP Characteristics.Removed SSW Pumps from Service & Reset OL Relay for Each SSW Pump +