Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 48069 +
- ML20028E785 +
- ML19343B433 +
- ST-HL-AE-3415, Supplemental Special Rept:Correcting Design Description of Jacket Water Temp Switch,Per Two Nonvalid Failures of Standby Diesel Generator on 880813 & 26.Design Affects Extent of Corrective Action Taken to Prevent Recurrence +
- ML20128P359 +
- ST-HL-AE-2776, Special Rept:On 880813 & 26,nonvalid Failures Occurred on Standby Diesel Generator 13.Caused by Spurious Failure of Jacket Water Temp Shutdown Switch to Reset When Generator 13 Started.Trip & Reset Setpoint for Jacket Water Recalibr +
- 05000029/LER-1989-013, :on 890829,reactor Scram Occurred When Train B Nonreturn Valve Trip Switch Inadvertently Placed in Trip Position.Caused by Personnel Error.Procedure Revised to Eliminate Switch Operation +
- 05000293/LER-1989-011, :on 890304,automatic Actuation of Portion of Primary Containment Isolation Control & Reactor Protection Sys Occurred During turbine-generator Coastdown.Caused by Turbine Bypass Valve Low Vacuum Trip +
- 05000249/LER-1986-011-07, :on 860817,fuse Blew During Voltage Reading of Open Position Indicating Limit Switch for Air Operated Valve Tripping Reactor Bldg Ventilation,Drywell Purge Fans & Sump Pumps.Caused by Personnel Error +
- 05000382/LER-1987-028, :on 871211,reactor Trip Occurred Due to Inadvertent Shutting of Msiv.Caused by Solenoid Valve Stuck Open During Testing.Solenoid Valve Replaced & MSIV Tested Successfully Prior to Restarting of Plant +
- 05000271/LER-1988-007, :on 880618,reactor Scram Occurred Due to Turbine Trip on High Reactor Water Level.Caused by Failed Bearing in Integrator Counter Drive Motor.Integrator Replaced +
- 05000461/LER-1996-011, :on 961002,EDG Surveillance Test Procedures Written to Satisfy TS (SR) 3.8.1.7, 3.8.1.12 & 3.8.1.19 Were Inadequate.Caused by Lack of Guidance in Surveillance Procedure.Procedures Revised +
- 05000293/LER-1992-016, :on 921213,automatic Scram Resulting from Load Rejection Occurred While at 48 Percent Reactor Power.Caused by 345 Kv Switchyard Flashovers Due to Salt Deposited During Severe Coastal Storm +
- 05000341/LER-1991-017, :on 910813,valve Discovered Closed When Group 9 Primary Containment Isolation Logic for Valve Inadvertently Energized.Caused by Personnel Error.Required Reading Given to I&C Personnel +
- 05000272/LER-1981-115-01, /01X-2:on 811125,during Routine Containment Insp, Svc Water Discovered Leaking from Second from Top Primary Cooling Coil on Containment Fan Coil Unit 24.Leak Repaired W/Belzona Metal Filler +
- 05000311/LER-1981-115-01, /01T-0:on 811125,svc Water Found Leaking at 0.5 Gpm from Second from Top Primary Cooling Coil on Containment Fan Coil Unit (Cfcu).Cfcu Declared Inoperable on 811127. Caused by Equipment Failure.Coil Repaired +
- 05000311/LER-1981-115, Forwards LER 81-115/01T-0.Detailed Event Analysis Encl +
- 05000353/LER-1989-015-02, :on 891223 & 24,problem W/Reactor Protection Sys (Rps)/Uninterruptable Power Supply Static Inverter Caused Loss of Power to RPS Panel.Caused by Failure of Gate Drive Boost Card.Isolations Reset +
- 05000352/LER-1988-027-01, :on 880721,main Control Room Ventilation Sys Isolated on Channel D High Chlorine Concentration Signal. Caused by Rainwater Coming in Contact W/Chlorine Analyzer Probe.Special Event Procedure SE-2 Implemented +
- ML19207B854 +
- 05000286/LER-2003-004, Indiant Point Unit 3 Re Plant in a Condition Prohibited by Technical Specifications Due to Late Recognition of Inoperable Battery as a Result of Improper Document Use +
- PLA-8174, Annual Radiological Environmental Operating Report (PLA-8174) +
- 05000352/LER-1988-027, :on 880721,control Room Ventilation Sys Isolated on Channel D High Chlorine Concentration Signal During Heavy Rain Storm.Caused by Rainwater in Contact W/ Chlorine Analyzer Probe.Mod Implemented +