- ENS 53381 +
- ML17328A814 +
- ML072530614 +
- 05000272/LER-1990-034, :on 901005,1101 & 12,containment Purge/Pressure Vacuum Relief Sys Isolation Signals Actuated as Result of Channel Spike on Containment Particulate Monitor 1R11A. Caused by Personnel Error +
- 05000272/LER-1990-034-01, :on 901005,containment purge/pressure-vacuum Relief Sys Isolation Signal Actuated as Result of Channel Spike on Radiation Monitoring Sys +
- ML18066A484 +
- ML19339C491 +
- PLA-7699, Annual Radiological Environmental Operating Report for 2017 +
- NL-04-152, November 2004 Monthly Operating Report, Indian Point Units 2 and 3 +
- ML20082C049 +
- ML20101B206 +
- ML20148F097 +
- ML20128L918 +
- ML20116E016 +
- ML20153F383 +
- ML20199B746 +
- IR 05000424/1987028 +
- BECO-LTR-92-133, Monthly Operating Rept for Nov 1992 for Pilgrim Nuclear Power Plant +
- 05000413/LER-1989-006-01, :on 890224-28,turbine Bldg Sump Radiation Monitor Unintentionally Returned to Svc in Inoperable Condition.Caused by Inappropriate Action Due to Lack of Attention to Detail +
- 05000352/LER-1987-029, :on 870616,various Nuclear Steam Supply Shutoff Sys Isolations Occurred.Caused by Incomplete Review of Implementation Method of Mod to Assess Potential Impact on Facility Operations.Review Underway +
- 05000498/LER-1989-005, :on 890120,alarms for Turbine Generator High Vibration & Bearing 8 & 9 High Temp Received W/Fire Subsequently Reported at Bearing 9.Caused by Loss of Cooling Hydrogen Due to Loose Temp Sensor Connection +
- 05000373/LER-1986-001-03, :on 860110,control Room HVAC Sys Ammonia Detector Tripped,Causing ESF Actuation.Caused by Master Fault Due to Misaligned Gate Assembly or Dirty Photo Cell. Detector Reset & Mechanism & Optics Cleaned +
- 05000272/LER-1985-011-01, :on 850922,unidentified RCS Leakage Exceeded Allowable Tech Spec Limit.Caused by Operator Error & Lack of Procedure.Steam Leaks Repaired,New Procedure Developed & Personnel Counseled +
- 05000272/LER-1985-011, :on 850922,review of Operational Leakage Event Revealed That Tech Spec Action Statement 3.4.6.2.b Not Entered as Required by Procedures.Caused by Operator Error. Supervisors Involved Counseled +
- 05000293/LER-1992-016, :on 921213,automatic Scram Resulting from Load Rejection Occurred While at 48 Percent Reactor Power.Caused by 345 Kv Switchyard Flashovers Due to Salt Deposited During Severe Coastal Storm +
- 05000334/LER-1991-029, :on 911106,AFW Pump Actuated Due to low-level Steam Generator Level.Caused by Lack of Secondary Flow to Steam Generators.Steam Generator Levels Stabilized & AFW Pump Secured +
- 05000352/LER-1991-012, :on 910508,reactor Encl Overpressurized & Blowout Panel Opened Due to Failure of C Reactor Encl HVAC Supply Air Fan.Fan Power Supply Breaker Trip Coil Replaced & Satisfactorily Tested +
- 05000373/LER-1991-003-05, :on 910319,lost Engineered Safety Feature Bus 143 During Surveillance.Caused by Deficient Procedure & Personnel Error.Training of Operational Analysis Dept Personnel Planned +
- 05000265/LER-1990-011-10, :on 901027,unit Scram from IRMs 13 & 16 high-high Signal Occurred.Caused by Personnel Inattention +
- 05000374/LER-1990-002-06, :on 900209,Operating Surveillance LOS-TG-W1 Determined to Have Exceeded Required Testing Interval,Per Tech Spec 3/4.7.10.Caused by Personnel Error.Personnel Counseled & Ref Procedures Will Be Revised +
- 05000334/LER-1989-017, :on 891218,feedwater Isolation ESF Actuation, Caused by Swell Phenomena Experienced After Opening of C Msiv.Feedwater Isolation Signal Reset & Restored to Prefeedwater Isolation Conditions +
- 05000334/LER-1989-017-01, :on 891218,feedwater Isolation Occurred Due to Erroneous Level Transmitter Root Valve Position Indication. Operations Personnel Reset Feedwater Isolation Signal +
- 05000346/LER-1980-060-01, /01T-0:on 800813,during Resetting of Trip Point, Decay Heat Isolation Valve Dh 11 Began Closing.Caused by Personnel Error.Dh 11 Reopened,Dh Pump 1-2 Started & Flow re-established.Tech Specs Amended +
- 05000280/LER-1989-042, :on 891031,leak Detected Through Crack in Fillet Weld on Socket Tee Connecting Drain Line to Letdown Line Which Exceeded Allowable Type C Leakage.Caused by Vibration.Line & Valve Configuration Changed +
- ML19284A716 +
- 05000334/LER-2014-002, Regarding Turbine Driven Auxiliary Feedwater Pump Governor Oscillations Result in Pump Trip +
- 05000334/LER-2003-007, Regarding Inadvertent Reactor Trip During Solid State Protection System Testing +
- ML24347A166 +
- 05000267/LER-1983-054-03, /03L-0:on 831213,emergency Feedwater Supply Header to Loop I Helium Circulators Unavailable to Drive Circulator Water Turbines.Caused by Repair to Safety Relief Valves & Pressure Control Valve +