Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25281A200 + (ML25281A200)
- ML25281A208 + (ML25281A208)
- ML25281A209 + (ML25281A209)
- ML25281A210 + (ML25281A210)
- ML25281A305 + (ML25281A305)
- ML25281A308 + (ML25281A308)
- ML25281A311 + (ML25281A311)
- ML25281A316 + (ML25281A316)
- ML25281A317 + (ML25281A317)
- ML25281A318 + (ML25281A318)
- ML25281A320 + (ML25281A320)
- L-25-189, Submittal of Post Accident Monitor Report + (ML25282A001)
- ML25282A002 + (ML25282A002)
- ML25282A003 + (ML25282A003)
- DCL-25-082, Materials Status Report for the Period Ending August 31, 2025 + (ML25282A009)
- RA-25-0210, Team Electric Plant, Units 1 and 2 - Notice of Intent to Pursue Subsequent License Renewal + (ML25282A010)
- 05000346/LER-2025-001, Required Shutdown for Steam Generator Low Level Instrumentation Reference Leg Steam Leak + (ML25282A050)
- 05000346/LER-2025-002, Cooldown to Mode 4 Not Completed in Required Time Due to Improper Procedure Routing + (ML25282A052)
- ML25282A056 + (ML25282A056)
- ML25282A064 + (ML25282A064)
- ULNRC-06977, Presentation Information for Pre-Application Meeting Regarding Transition to Advanced Westinghouse Fuel and Upgrade of Analytical Methods at Callaway Plant + (ML25282A065)
- ML25282A066 + (ML25282A066)
- ML25282A069 + (ML25282A069)
- ML25282A070 + (ML25282A070)
- ML25282A071 + (ML25282A071)
- LG-25-132, License Amendment and Alternative Request Related to One-Time Exception of Primary Containment Isolation Valve Testing + (ML25282A072)
- ML25282A073 + (ML25282A073)
- NL-25-0390, Proposed Inservice Inspection Alternative FNP-ISI-ALT-2025-10 for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements in Accordance with 10 CFR 50.55a(z)(1) Response to Request for Additional Info + (ML25282A075)
- RA-24-0273, License Amendment Request to Revise Technical Specifications to Use Online Monitoring Methodology + (ML25282A076)
- ML25283A020 + (ML25283A020)
- 05000282/LER-2025-002, Control Room Chiller Inoperable Due to Purge System Failure + (ML25283A066)
- NOC-AE-250041, Extension Request for Implementation of Order Approving Direct Transfer of Licenses + (ML25283A067)
- PMNS20251162, Teams Call with TRISO-X, Llc. (TRISO-X) to Discuss Draft Responses to the Management Measures and Quality Assurance Request for Additional Information (RAI) Supplements + (ML25283A068)
- LR-N25-0083, Supplement to License Amendment Requests to Adopt TSTF-505, TSTF-591, and 10 CFR 50.69 + (ML25283A069)
- ML25283A072 + (ML25283A072)
- L-2025-171, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums + (ML25286A001)
- L-2025-172, Submission of Periodic Reports + (ML25286A002)
- 05000446/LER-2025-001, (Cpnpp), Containment Spray Pump Declared Inoperable Due to Misaligned Breaker + (ML25286A003)
- PMNS20251147, Hadron Energy Inc. Public Meeting to on Microreactor Fuel Qualification. Meeting Canceled Due to Government Shutdown! + (ML25287A001)
- ML25287A002 + (ML25287A002)
- ML25287A003 + (ML25287A003)
- ML25287A004 + (ML25287A004)
- ML25287A011 + (ML25287A011)
- NUREG-2268, Environmental Impact Statement for the Construction Permit Application for Kemmerer Power Station Unit 1 Final Report + (ML25287A017)
- 05000446/LER-2025-002, (Cpnpp), Safety Chiller Inoperable Due to Failure of Copper Refrigerant Fittings + (ML25287A021)
- ML25287A024 + (ML25287A024)
- ML25287A025 + (ML25287A025)
- ML25287A026 + (ML25287A026)
- 05000348/LER-2025-001, Emergency Diesel 1C Unable to Achieve 110% of Maximum Load + (ML25287A034)
- IR 05000275/2025301 + (ML25287A155)
- NL-25-0378, Core Operating Limits Report, Cycle 2 + (ML25287A158)