Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PMNS20240449, Meeting with Constellation Energy Generation, LLC to Discuss a License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 + (ML24131A139)
- NL-24-0191, Annual Radiological Environmental Operating Reports for 2023 + (ML24131A140)
- IR 05000259/2024001 + (ML24131A141)
- ML24131A142 + (ML24131A142)
- ML24131A143 + (ML24131A143)
- ML24131A147 + (ML24131A147)
- ML24131A148 + (ML24131A148)
- ML24131A149 + (ML24131A149)
- ML24131A151 + (ML24131A151)
- L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut + (ML24131A152)
- ML24131A153 + (ML24131A153)
- ML24131A155 + (ML24131A155)
- ML24131A156 + (ML24131A156)
- ML24132A002 + (ML24132A002)
- ML24132A009 + (ML24132A009)
- ML24134A004 + (ML24134A004)
- IR 05000443/2024001 + (ML24134A006)
- ML24134A014 + (ML24134A014)
- IR 05000361/2024003 + (ML24134A022)
- ML24134A024 + (ML24134A024)
- ML24134A026 + (ML24134A026)
- IR 015000005/2024001 + (ML24134A053)
- PMNS20240662, Notice of Meeting with Southern Nuclear Operating Company (SNC) Regarding the Steam Generator (SG) Tube Inspection Report for Vogtle, Unit 1 + (ML24134A059)
- PMNS20240661, ADAMS Public Search Public Meeting + (ML24134A061)
- IR 05000390/2024001 + (ML24134A063)
- 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications + (ML24134A064)
- ML24134A072 + (ML24134A072)
- ML24134A090 + (ML24134A090)
- IR 05000387/2024001 + (ML24134A093)
- PMNS20240677, Purpose of MRP-484, Guidance on Timing for Technical Specifications Revision Following Surveillance Capsule Testing, and EPRIs Desired Outcome of the NRC Staffs Review + (ML24134A100)
- ML24134A102 + (ML24134A102)
- ML24134A106 + (ML24134A106)
- ML24134A109 + (ML24134A109)
- L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report + (ML24134A111)
- ML24134A113 + (ML24134A113)
- L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation + (ML24134A115)
- NUREG/CR-2907 Volume 27, Radioactive Effluents from Nuclear Power Plants: Annual Report 2021 + (ML24134A119)
- PMNS20240676, Melco Meltac Request for Additional Information Response and Supplement Discussion + (ML24134A130)
- ML24134A138 + (ML24134A138)
- ML24134A152 + (ML24134A152)
- ML24134A153 + (ML24134A153)
- ML24134A156 + (ML24134A156)
- ML24134A173 + (ML24134A173)
- PMNS20240636, Pre-Submittal Meeting with Holtec Decommissioning International, LLC, to Discuss a License Amendment Request to Approve the Biasi Critical Heat Flux Correlation for Use with the Main Steam Line Break Analysis for the Palisades Nuclear P + (ML24134A174)
- ML24134A176 + (ML24134A176)
- ML24134A178 + (ML24134A178)
- ML24134A179 + (ML24134A179)
- ML24134A187 + (ML24134A187)
- ML24134A188 + (ML24134A188)
- ML24134A189 + (ML24134A189)
- ML24134A190 + (ML24134A190)