Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216E796 + (ML20216E796)
- ML20216E798 + (ML20216E798)
- ML20216E800 + (ML20216E800)
- ML20216E802 + (ML20216E802)
- ML20216E804 + (ML20216E804)
- ML20216E807 + (ML20216E807)
- ML20216E813 + (ML20216E813)
- ML20216E819 + (ML20216E819)
- 05000295/LER-1997-018-01, Forwards LER 97-018-01,which Clarifies Info on Event Description,Root Causes & Safety Analysis.Corrective Actions Have Also Been Updated.Commitments Made within Ltr,Encl + (ML20216E820)
- ML20216E830 + (ML20216E830)
- ST-HL-AE-5739, Notifies Commission That M Berrens Will No Longer Serve in Position Requiring SRO License + (ML20216E831)
- ML20216E832 + (ML20216E832)
- ML20216E834 + (ML20216E834)
- 05000295/LER-1997-018, :on 970806,failure to Recognize 125 Vdc Buses Inoperable During Unit cross-tie Prior to Sept 1996 Calculation.Caused by Inadequate TS Review Process.Revised Procedures Associated W/Station Battery Testing + (ML20216E836)
- ML20216E839 + (ML20216E839)
- ML20216E841 + (ML20216E841)
- 05000368/LER-1997-006, :on 970606,inadvertent Start of EDG Start Occurred.Caused by Inadequate Written Communication Re Job Order Instructions.Job Order & Appropriate Procedures Revised + (ML20216E842)
- ML20216E843 + (ML20216E843)
- ML20216E845 + (ML20216E845)
- ML20216E846 + (ML20216E846)
- ML20216E847 + (ML20216E847)
- PNO-III-97-076, on 970908,industrial Radiography Event Occurred.Radiographer Immediately Contacted Licensee Assistant Corporate Rso,In Vicinity of Detroit,Mi.Nrc Region III Will Review Circumstances Surrounding Incident + (ML20216E849)
- ML20216E852 + (ML20216E852)
- JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With + (ML20216E856)
- IR 015000042/1998005 + (ML20216E857)
- 05000483/LER-1999-005, :on 990812,operating Conditions Exceeding Previously Analyzed Values Resulted in Inoperability of Both Offsite Sources.Caused by Inadequate Acs.Changed Transformer Tap Settings.With + (ML20216E858)
- ML20216E859 + (ML20216E859)
- PNO-III-97-077, on 970909,licensee Began Reactor Shutdown After Steam Leak Identified in Steam Tunnel.Leak Was on Capped Drain Line Off a Main Steam Line,Between Two Main Steam Isolation Valves.State of IA Will Be Notified + (ML20216E860)
- 05000483/LER-1999-006, :on 990813,inadvertent Closure of Pump Suction Valve Occurred Due to Startup FW Pump Trip.Caused by Workman Protection Assurance Program Tag Created in Error.Procedure Re Reporting Requirements Will Be Revised.With + (ML20216E861)
- ML20216E865 + (ML20216E865)
- ML20216E871 + (ML20216E871)
- ML20216E872 + (ML20216E872)
- 05000498/LER-1999-007, :on 990812,plant Train B CR Makeup & Cleanup Filtration Sys Was Declared Inoperable for Greater than Aot. Caused by Degradation of Makeup Filter & Filter Charcoal Due to Aging.Subject Filter Was Replaced on 990805 + (ML20216E873)
- ML20216E879 + (ML20216E879)
- ML20216E880 + (ML20216E880)
- ML20216E881 + (ML20216E881)
- ML20216E885 + (ML20216E885)
- ML20216E887 + (ML20216E887)
- ML20216E892 + (ML20216E892)
- ML20216E893 + (ML20216E893)
- ML20216E895 + (ML20216E895)
- ML20216E896 + (ML20216E896)
- ML20216E897 + (ML20216E897)
- ML20216E902 + (ML20216E902)
- 05000461/LER-1996-010-01, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Even + (ML20216E904)
- ML20216E911 + (ML20216E911)
- ML20216E912 + (ML20216E912)
- ML20216E915 + (ML20216E915)
- ML20216E917 + (ML20216E917)
- ML20216E921 + (ML20216E921)
- ML20216E922 + (ML20216E922)