Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214P672 + (ML20214P672)
- ML20214P673 + (ML20214P673)
- ML20214P674 + (ML20214P674)
- IR 05000455/1986036 + (ML20214P675)
- IR 05000455/1986025 + (ML20214P677)
- ML20214P678 + (ML20214P678)
- ML20214P681 + (ML20214P681)
- 05000327/LER-1987-022, :on 870428,six Valves in Fire Protection Sys Not Cycle Tested,Per Tech Spec Surveillance Requirement. Caused by Inadequate Procedure.Surveillance Instruction Revised to Include Six Valves in Checklist + (ML20214P683)
- ML20214P686 + (ML20214P686)
- ML20214P687 + (ML20214P687)
- ML20214P691 + (ML20214P691)
- ML20214P692 + (ML20214P692)
- ML20214P693 + (ML20214P693)
- ML20214P694 + (ML20214P694)
- ML20214P695 + (ML20214P695)
- 05000320/LER-1986-006, :on 860715,contaminated Camera Tripod Discovered in Dumpster in Unrestricted Area.Caused by Failure of Unknown Personnel to Implement Controls When Transferring Matl.Tripod Decontaminated + (ML20214P698)
- RBG-24820, Special Rept:Marker 34 Discovered to Have Settled Total of 1.03 Inches as of Oct 1986 Quarterly Survey,Exceeding Tech Spec Table 3.7.10-1 Limits.Marker Predicted Value Revised. Settlement Incorporated Into Proposed Tech Spec Change + (ML20214P700)
- ML20214P701 + (ML20214P701)
- 05000482/LER-1986-061, :on 861031,motor Circuit Breaker for Centrifugal Charging Pump a Racked Down,While Charging Pump B Out of Svc.Caused by Personnel Error.Oversight Discussed W/Involved Personnel + (ML20214P703)
- L-86-476, Revises Response to Finding B.1 Noted in Insp Repts 50-250/86-33 & 50-251/86-33.Corrective Actions:Insp & Checkout of Loop Performed & Procedure ONOP-0208.14 Revised to Clarify Channel Spiking Requirements + (ML20214P704)
- ML20214P705 + (ML20214P705)
- ML20214P710 + (ML20214P710)
- ML20214P711 + (ML20214P711)
- 05000327/LER-1987-023, :on 870430,insp of Ice Condenser Vent Assemblies Not Performed,Per Tech Specs Due to Lack of Guidance in Surveillance Instruction.Instruction Revised to Clarify Insp Requirements + (ML20214P716)
- ML20214P718 + (ML20214P718)
- TXX-5013, Interim Deficiency Rept CP-86-15 Re Field Flash & K1 Relays Required to Operate During Starting Process of Diesel Generators.Initially Reported on 860314.Evaluation Continuing.Next Rept Will Be Submitted by 860930 + (ML20214P720)
- ML20214P723 + (ML20214P723)
- ML20214P728 + (ML20214P728)
- ML20214P729 + (ML20214P729)
- ML20214P733 + (ML20214P733)
- ML20214P734 + (ML20214P734)
- ML20214P735 + (ML20214P735)
- ML20214P738 + (ML20214P738)
- ML20214P739 + (ML20214P739)
- RBG-24819, Special Rept:On 861018,Div II Diesel Generator Experienced Invalid Failure During Surveillance Testing.Caused by Improper Determination of Normal Background Vibration Level During Previous Engine Run.Vibration Switch Readjusted + (ML20214P741)
- 1CAN098609, Forwards Proprietary & Nonproprietary, Inadequate Core Cooling Monitoring Sys Final Design Description, Per NUREG-0737,Item II.F.2.Proprietary Rept Withheld (Ref 10CFR2.790) + (ML20214P742)
- NUREG-0845, Advises of Change in NRC Onsite Staffing & Function During Emergency.Region II Incident Response Team Will No Longer Provide Primary Communicator for Emergency Notification Sys & Health Physics Network at Emergency Response Facilities + (ML20214P743)
- TXX-6473, Forwards Revised Response to Violations Noted in Insp Repts 50-445/86-14 & 50-446/86-11.Corrective Actions:Procedures EEI-7,CP-CPM-14.1 & QI-QP-11.3-26 Revised & Applicable Const Personnel Trained in Revised Requirements + (ML20214P744)
- ML20214P746 + (ML20214P746)
- TXX-6475, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Class 1E Applications. Initially Reported on 861010.Future 7000 Series Relays Will Be Purchased with E Prefix.Next Rept Expected by 871009 + (ML20214P747)
- ML20214P748 + (ML20214P748)
- 05000483/LER-1987-007, :on 870504,control Room Ventilation Isolation Occurred When Test Probes of Digital Voltmeter Placed Across Incorrect Terminals in Solid State Protection Sys Cabinet. Caused by Personnel Error + (ML20214P749)
- ML20214P750 + (ML20214P750)
- ST-HL-AE-2200, Third Interim Deficiency Rept Re Electrical Splices Using Raychem Heat Shrink Insulation Matl Installed Incorrectly. Initially Reported on 870219.Insp in Progress to Determine Number of Incorrectly Installed Splices.Next Rept by 870610 + (ML20214P751)
- ML20214P752 + (ML20214P752)
- TXX-6477, Advises That Completion of Environ Qualification Verification Program Corrective Actions Described in App B, Item I.B.5 of Enforcement Action 86-09 Revised to 871001 for Unit 1 & 881101 for Unit 2 + (ML20214P753)
- ML20214P754 + (ML20214P754)
- ML20214P756 + (ML20214P756)
- ST-HL-AE-2177, Final Deficiency Rept Re Small Break LOCA Mitigation During Plant Shutdown.Initially Reported on 860929.For Small Breaks in Modes 3 & 4,issue Not Reportable Under 10CFR50.55(e) + (ML20214P759)
- ML20214P760 + (ML20214P760)
- TXX-6464, Final Deficiency Rept CP-86-69 Re Failure to Incorporate Specific Restraining/Support Requirements Into Project Specs & Procedures.Initially Reported on 861002.Design Change Authorization Issued to Revise Spec 2323-ES-100 + (ML20214P761)