Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211L647 + (ML20211L647)
- ML20211L648 + (ML20211L648)
- ML20211L649 + (ML20211L649)
- ML20211L652 + (ML20211L652)
- ML20211L653 + (ML20211L653)
- ML20211L654 + (ML20211L654)
- ML20211L655 + (ML20211L655)
- ML20211L656 + (ML20211L656)
- 05000336/LER-1986-004-01, :on 860601,reactor Trip Occurred Due to Reactor Coolant Pump Underspeed.Caused by Loss of Power to Bus 25B. Increase in Time Delay in Eight Applicable Time Delay Agastat Relays Will Be Evaluated + (ML20211L658)
- ML20211L659 + (ML20211L659)
- ML20211L662 + (ML20211L662)
- 05000316/LER-1986-030, :on 861112-13,unit Operated W/One air-operated Containment Isolation Valve Inservice W/O Having Closing Time Determined After Packing Adjustment.Caused by Personnel Error.Leak Test Procedure Will Be Revised + (ML20211L664)
- ML20211L666 + (ML20211L666)
- PMNS20200899, Incorporation by Reference of American Society of Mechanical Engineers Codes Into the U.S. Nuclear Regulatory Commission Regulations + (ML20211L668)
- ML20211L682 + (ML20211L682)
- ML20211L683 + (ML20211L683)
- ML20211L684 + (ML20211L684)
- ML20211L685 + (ML20211L685)
- ML20211L688 + (ML20211L688)
- WBL-20-036, Of the Unit Cycle 2 Cycle 3 Core Operating Limits Report (COLR) + (ML20211L689)
- ML20211L692 + (ML20211L692)
- ML20211L698 + (ML20211L698)
- IR 05000369/2020002 + (ML20211L704)
- ML20211L705 + (ML20211L705)
- ML20211L707 + (ML20211L707)
- IR 05000456/2020002 + (ML20211L708)
- ML20211L711 + (ML20211L711)
- ML20211L714 + (ML20211L714)
- ML20211L716 + (ML20211L716)
- ML20211L717 + (ML20211L717)
- ML20211L727 + (ML20211L727)
- ML20211L730 + (ML20211L730)
- ML20211L732 + (ML20211L732)
- IR 05000483/2020002 + (ML20211L743)
- ML20211L744 + (ML20211L744)
- ML20211L747 + (ML20211L747)
- ML20211L752 + (ML20211L752)
- ML20211L754 + (ML20211L754)
- ML20211L778 + (ML20211L778)
- ML20211L780 + (ML20211L780)
- ML20211L781 + (ML20211L781)
- ML20211L782 + (ML20211L782)
- ML20211L783 + (ML20211L783)
- ML20211L784 + (ML20211L784)
- ML20211L785 + (ML20211L785)
- ML20211L786 + (ML20211L786)
- ND-20-0907, Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1) + (ML20211L787)
- IR 05000266/2020011 + (ML20211L794)
- ML20211L795 + (ML20211L795)
- ML20211L803 + (ML20211L803)
- L-2020-129, Commitment Revision Summary Report for MOV-3-751 + (ML20211L804)