Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209C307 + (ML20209C307)
- ML20209C309 + (ML20209C309)
- ML20209C310 + (ML20209C310)
- ML20209C311 + (ML20209C311)
- ML20209C314 + (ML20209C314)
- ML20209C315 + (ML20209C315)
- ML20209C316 + (ML20209C316)
- ML20209C317 + (ML20209C317)
- ML20209C318 + (ML20209C318)
- ML20209C320 + (ML20209C320)
- ML20209C325 + (ML20209C325)
- ML20209C326 + (ML20209C326)
- ML20209C327 + (ML20209C327)
- ML20209C328 + (ML20209C328)
- ML20209C330 + (ML20209C330)
- ML20209C331 + (ML20209C331)
- ML20209C332 + (ML20209C332)
- ML20209C333 + (ML20209C333)
- 05000369/LER-1987-007-02, :on 870317,incorrect Actuation Tubing Connections on Halon Fire Suppression Sys Discovered.Caused by Failure of Procedure to Ensure That Tubing Was Properly Reconnected.Tubing Connections Corrected + (ML20209C334)
- ML20209C336 + (ML20209C336)
- IR 05000354/1987010 + (ML20209C338)
- ML20209C339 + (ML20209C339)
- 05000423/LER-1986-045, :on 860731,containment Local Leak Rates May Have Exceeded Tech Specs 3.6.1.b & 3.6.1.2.c Limits.Caused by Damaged Chilled Water Sys Train a & B Supply Valves. Valves Repaired + (ML20209C341)
- ML20209C343 + (ML20209C343)
- ML20209C345 + (ML20209C345)
- ML20209C346 + (ML20209C346)
- ML20209C347 + (ML20209C347)
- ML20209C350 + (ML20209C350)
- ML20209C351 + (ML20209C351)
- ML20209C352 + (ML20209C352)
- ML20209C357 + (ML20209C357)
- ML20209C359 + (ML20209C359)
- ML20209C360 + (ML20209C360)
- IR 05000373/1986021 + (ML20209C364)
- ML20209C365 + (ML20209C365)
- ML20209C369 + (ML20209C369)
- ML20209C370 + (ML20209C370)
- ML20209C372 + (ML20209C372)
- ML20209C375 + (ML20209C375)
- IA-85-544, Forwards Util 830311 Ltr Confirming Need for Improvement & Commitment to Specific Corrective Actions Made During 830309 Emergency Conference Call.Region V Concurs in Deferral of Full Power License Meeting for 30 Days + (ML20209C377)
- ML20209C377 + (ML20209C377)
- ML20209C379 + (ML20209C379)
- ML20209C381 + (ML20209C381)
- ML20209C382 + (ML20209C382)
- ML20209C383 + (ML20209C383)
- ML20209C385 + (ML20209C385)
- 05000263/LER-1999-006-01, :on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With + (ML20209C388)
- ML20209C389 + (ML20209C389)
- ML20209C390 + (ML20209C390)
- ML20209C391 + (ML20209C391)
- 05000321/LER-1987-005-02, :on 870318,one Secondary Containment Ventilation Exhaust Damper Did Not Actuate During Surveillance.Caused by Locking on Air Bleed Off Port Adjusting Screw.Maint Work Orders Generated + (ML20209C393)