- ML20207P743 + (ML20207P743)
- ML20207P746 + (ML20207P746)
- ML20207P747 + (ML20207P747)
- ML20207P748 + (ML20207P748)
- ML20207P752 + (ML20207P752)
- ML20207P754 + (ML20207P754)
- ML20207P756 + (ML20207P756)
- ML20207P757 + (ML20207P757)
- ML20207P759 + (ML20207P759)
- 05000247/LER-1986-039, :on 861217,control Rod (Rod) BO6 in Control Tank D Found Misaligned from Demand Position by 20 Steps for 16 H Prior to Discovery.Cause Unknown.Personnel Counseled on Maint of Monitor + (ML20207P765)
- IA-88-464, Requests That Generic Issue (GI) 119.1, Pipe Rupture Requirements & Decoupling of Seismic Loads Be Subsumed in Remaining Portion of GI B-6, Loads,Load Combinations & Stress Limits + (ML20207P766)
- ML20207P766 + (ML20207P766)
- ML20207P767 + (ML20207P767)
- ML20207P769 + (ML20207P769)
- 05000259/LER-1986-034-01, :on 861209,control Room Emergency Ventilation Train a & B Initiation Occurred.Caused by Partially Inserted Check Source in Radiation Monitor 90-259B.Surveillance Instruction Performed.Monitor Returned to Svc + (ML20207P771)
- ML20207P772 + (ML20207P772)
- ML20207P773 + (ML20207P773)
- 05000219/LER-1986-030, :on 861210,isolation Condenser a Isolated on High Flow Signal from Condensate Return Line Flow Sensor Due to Pressure Line Leak.Caused by Procedural Deficiency. Procedure Will Be Revised + (ML20207P775)
- 05000336/LER-1986-023-01, :on 861213,charging Pump C Found to Be Leaking Water from Pump Head Area.Caused by Cracked Pump Block. Block Replaced + (ML20207P776)
- ML20207P777 + (ML20207P777)
- ML20207P779 + (ML20207P779)
- ML20207P780 + (ML20207P780)
- ML20207P781 + (ML20207P781)
- 05000458/LER-1986-067, :on 861210,while Performing RCIC Pump Operability Test,Div I Isolation of Rcic/Rhr Steam Supply Line Occurred.Caused by Water Column Forming Inside Sensing Line.Instrument Loop Trip Setpoints Lowered + (ML20207P782)
- B12402, Rev 7 to Emergency Plan Implementing Procedure EPIP 1.5-11, Personnel Injuries, Rev 2 to EPIP 1.5-47, Operation of Wide-Range Gas Monitor During Accident Condition & Rev 3 to EPIP 1.5-48, Control Room Data Coordinator + (ML20207P783)
- TXX-6207, Followup Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program. Initially Reported on 860609.List of Mods Issued to Date Encl.Next Rept Will Be Submitted on 870220 + (ML20207P785)
- 05000336/LER-1986-008, :on 860920,6 of 16 Valves Failed Main Steam Safety Valves Simmer Test Used to Verify Pressure Setpoint. Cause of Setpoint Drift Unknown.Increased Accuracy Pressure Gauges Used to Reduce Test Error + (ML20207P786)
- ML20207P787 + (ML20207P787)
- 05000285/LER-1986-005, :on 861218,performance of ST-CEA-1 F.4 Test Completed 1 Day Beyond Allowed Interval.Caused by Failure to Meet Time Interval Requirement for Test Scheduled on 861208. Guidance Note Incorporated Into ST-CEA-1 + (ML20207P788)
- ML20207P789 + (ML20207P789)
- ML20207P792 + (ML20207P792)
- 05000336/LER-1986-012, :on 861009,containment Penetration 14 Leakage Test Reported Leakage Rate Exceeded Limits.Caused by Debris Lodged Under Valve Seat Preventing Full Closure of Valve. Debris Removed + (ML20207P795)
- ML20207P799 + (ML20207P799)
- ML20207P802 + (ML20207P802)
- TXX-6217, Forwards S&W Rev 0 to Instrumentation & Control Generic Issue Rept,Comanche Peak Steam Electric Station, for Resolution of Specific Design Issues Per Design Basis Consolidation Program + (ML20207P803)
- ML20207P810 + (ML20207P810)
- ML20207P813 + (ML20207P813)
- ML20207P814 + (ML20207P814)
- ML20207P815 + (ML20207P815)
- 05000400/LER-1986-010-03, :on 861218,effluent Gas Grab Sample from Turbine Bldg Vent Stack Radiation Monitor RM-1TV-3536-1 Missed.Caused by Technician Involvement in Other Activities. Sample Taken.Personnel Counseled + (ML20207P816)
- ML20207P818 + (ML20207P818)
- ML20207P822 + (ML20207P822)
- IR 05000412/1986045 + (ML20207P826)
- ST-HL-AE-1881, Revised Final Deficiency Rept Re Control of Nonconforming Items,Including Transfer & Replacement Requests.Initially Reported on 860930.Addl Administrative Corrective Actions & QA Verifications Will Be Comnpleted by 870215 + (ML20207P828)
- ML20207P829 + (ML20207P829)
- ML20207P830 + (ML20207P830)
- ML20207P831 + (ML20207P831)
- ML20207P832 + (ML20207P832)
- ML20207P833 + (ML20207P833)
- TXX-6206, Interim Deficiency Rept CP-86-36 Re Large Bore Piping & Supports.Initially Reported on 860609.Continuing Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Will Be Issued by 870220 + (ML20207P834)
- ML20207P835 + (ML20207P835)