Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207L871 + (ML20207L871)
- ML20207L874 + (ML20207L874)
- ML20207L876 + (ML20207L876)
- ML20207L879 + (ML20207L879)
- ML20207L880 + (ML20207L880)
- ML20207L881 + (ML20207L881)
- IR 05000382/1988020 + (ML20207L882)
- ML20207L885 + (ML20207L885)
- IR 05000313/1988022 + (ML20207L886)
- ML20207L887 + (ML20207L887)
- ML20207L888 + (ML20207L888)
- 05000374/LER-1988-005, :on 880412,flow Switch Found W/Setpoint Out of Tolerance Below Reject Limit for Application.Caused by Setpoint Drift.Flow Switch Replaced & Old Switch Sent to Mfg for Diassembly & Insp + (ML20207L891)
- ML20207L893 + (ML20207L893)
- ML20207L895 + (ML20207L895)
- 0CAN098802, Responds to Violations Noted in Insp Repts 50-313/88-22 & 50-368/88-22.Corrective Actions:Power Ascension Testing Documentation Review Completed by Reactor Engineering Per Procedure 2302.034 Requirements + (ML20207L896)
- IR 05000424/1999001 + (ML20207L897)
- ML20207L899 + (ML20207L899)
- ML20207L901 + (ML20207L901)
- ML20207L902 + (ML20207L902)
- ML20207L903 + (ML20207L903)
- ML20207L904 + (ML20207L904)
- ML20207L905 + (ML20207L905)
- ML20207L906 + (ML20207L906)
- ML20207L908 + (ML20207L908)
- ML20207L911 + (ML20207L911)
- B17683, Informs NRC That Util Will Be Ready for Start of Operational Safety Team Insp on 990315,based Upon Assessments of Elements Associated with Insp Scope + (ML20207L912)
- ML20207L915 + (ML20207L915)
- ML20207L916 + (ML20207L916)
- ML20207L917 + (ML20207L917)
- ML20207L918 + (ML20207L918)
- ML20207L919 + (ML20207L919)
- ML20207L920 + (ML20207L920)
- ML20207L922 + (ML20207L922)
- ML20207L923 + (ML20207L923)
- ML20207L925 + (ML20207L925)
- ML20207L926 + (ML20207L926)
- NOC-AE-000431, Application for Amend to Licenses NPF-76 & NPF-80,deleting TS 6.2.3, Independent Safety Engineering Group (Iseg), from TS Requirements,With Supporting Changes to Operations QA Plan + (ML20207L927)
- ML20207L931 + (ML20207L931)
- ML20207L933 + (ML20207L933)
- ML20207L937 + (ML20207L937)
- ML20207L938 + (ML20207L938)
- ML20207L940 + (ML20207L940)
- ML20207L943 + (ML20207L943)
- ML20207L944 + (ML20207L944)
- ML20207L946 + (ML20207L946)
- ML20207L949 + (ML20207L949)
- ML20207L952 + (ML20207L952)
- ML20207L953 + (ML20207L953)
- ML20207L954 + (ML20207L954)
- IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl + (ML20207L957)
- ML20207L957 + (ML20207L957)