Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207A958 + (ML20207A958)
- ML20207A959 + (ML20207A959)
- ML20207A961 + (ML20207A961)
- ML20207A963 + (ML20207A963)
- ML20207A965 + (ML20207A965)
- ML20207A967 + (ML20207A967)
- ML20207A968 + (ML20207A968)
- ML20207A974 + (ML20207A974)
- ML20207A975 + (ML20207A975)
- ML20207A979 + (ML20207A979)
- ML20207A980 + (ML20207A980)
- NRC-99-0014, Forwards semi-annual fitness-for-duty Rept for Period of 980701-1231,per 10CFR26.71(d) + (ML20207A983)
- ML20207A985 + (ML20207A985)
- ML20207A989 + (ML20207A989)
- ML20207A990 + (ML20207A990)
- ML20207A991 + (ML20207A991)
- NOC-AE-00441, Forwards Semiannual Fitness for Duty Program Rept for Period Jul-Dec 1998,per 10CFR26.71(d) + (ML20207A993)
- ML20207A994 + (ML20207A994)
- ML20207A995 + (ML20207A995)
- ML20207A998 + (ML20207A998)
- IA-86-680, Final Response to FOIA Request.App a Documents Available in Pdr.Subj Contracts Are Filed in PDR + (ML20207A999)
- ML20207A999 + (ML20207A999)
- ML20207B002 + (ML20207B002)
- 05000499/LER-1999-002, :on 990121,Unit 2 Experienced Automatic Reactor Trip Due to Closure of Turbine Throttle Valves.Caused by Inadequate self-verification by Individual.Operations Mgt Has Briefed All Operations Personnel + (ML20207B006)
- ML20207B007 + (ML20207B007)
- ML20207B012 + (ML20207B012)
- IA-86-891, Summary of 860708-09 Meetings W/Interofc Task Group on Performance Indications Re Updating Performance Indicators, Lead Responsibilities,Data Period & Data Sources for Trial Program.Next Meetings Scheduled for 860805-06 & 19-20 + (ML20207B013)
- ML20207B013 + (ML20207B013)
- ML20207B014 + (ML20207B014)
- ML20207B017 + (ML20207B017)
- ML20207B019 + (ML20207B019)
- ML20207B024 + (ML20207B024)
- ML20207B025 + (ML20207B025)
- ML20207B027 + (ML20207B027)
- ML20207B035 + (ML20207B035)
- ML20207B037 + (ML20207B037)
- ML20207B038 + (ML20207B038)
- ML20207B040 + (ML20207B040)
- ML20207B042 + (ML20207B042)
- VPN-028-99, Forwards Endorsements 139 to Nelia Policy NF-0225 & 2 to Nelia Policy NW-0602 + (ML20207B044)
- ML20207B045 + (ML20207B045)
- ML20207B046 + (ML20207B046)
- 05000289/LER-1999-001, Forwards LER 99-001-00,re Short Sections of Piping Were Below Temps Specified in FSAR Section 9.2.1.2.LER Is follow-up to Notification Made Via ENS Telephone to NRC on 990122 + (ML20207B047)
- ML20207B048 + (ML20207B048)
- 05000289/LER-1999-001-01, :on 990122,short Sections of Piping Caused by Misplacement of Sensing Elements & Insulation.Caused by Failure to Adhere to Vendor instruction.Re-installed Heat Trace Sys + (ML20207B056)
- ML20207B057 + (ML20207B057)
- ML20207B059 + (ML20207B059)
- ML20207B060 + (ML20207B060)
- ML20207B063 + (ML20207B063)
- U-603171, Forwards Response to NRC List of Questions Re LAR Re Overall Effort to Resolve Degraded Voltage Concerns at CPS + (ML20207B064)
- 05000461/LER-1999-004, :on 990126,plant Was Operating Outside Design Basis.Caused Because Design for CR Operator Dose Calculation Did Not Consider Single Failure of CR Ventilation Sys. Revised CR Operator Dose Calculation.With + (ML20207B069)
- ML20207B070 + (ML20207B070)