Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205H823 + (ML20205H823)
- ML20205H826 + (ML20205H826)
- ML20205H828 + (ML20205H828)
- DCL-86-235, Submits Accurate Description of Wastewater Holding Pond for Best Mgt Practices Plan Item B.6.Pond Used Only Occasionally to Temporarily Store Wastewater That Cannot Be Discharged. Plan Rev Being Prepared for Adoption by 870131 + (ML20205H829)
- ML20205H831 + (ML20205H831)
- ML20205H833 + (ML20205H833)
- ML20205H834 + (ML20205H834)
- ML20205H836 + (ML20205H836)
- ML20205H838 + (ML20205H838)
- ML20205H840 + (ML20205H840)
- ML20205H841 + (ML20205H841)
- ML20205H842 + (ML20205H842)
- ML20205H845 + (ML20205H845)
- ML20205H846 + (ML20205H846)
- ML20205H850 + (ML20205H850)
- ML20205H851 + (ML20205H851)
- PNO-I-88-110, on 881021,delay in Restart of Units 2 & 3 Until Second & Third Quarter 1989,respectively,to Allow Further Upgrade in Operator Training,Managerial & Supervisory Effectiveness & Plant Security + (ML20205H853)
- ML20205H855 + (ML20205H855)
- ML20205H856 + (ML20205H856)
- ML20205H860 + (ML20205H860)
- ML20205H863 + (ML20205H863)
- ML20205H864 + (ML20205H864)
- ML20205H869 + (ML20205H869)
- ML20205H872 + (ML20205H872)
- ML20205H875 + (ML20205H875)
- 05000249/LER-1987-003-06, :on 870227,shutdown Cooling HX Outlet Temp Found Greater than 212 F.Caused by Operator Failure to Adequately Monitor Reactor Water Temp on Proper Instrumentation.Water Temp Reduced + (ML20205H878)
- ML20205H879 + (ML20205H879)
- ML20205H881 + (ML20205H881)
- ML20205H882 + (ML20205H882)
- ML20205H883 + (ML20205H883)
- ML20205H884 + (ML20205H884)
- 05000458/LER-1987-005, :on 870223,condition Rept Initiated Re Several Fire Barriers W/Minor Cracks & Wear Conditions.Caused by Deficiency in Vendor Installation & QC Insp Program + (ML20205H885)
- ML20205H887 + (ML20205H887)
- ML20205H889 + (ML20205H889)
- ML20205H890 + (ML20205H890)
- ML20205H893 + (ML20205H893)
- ML20205H894 + (ML20205H894)
- ML20205H896 + (ML20205H896)
- ML20205H897 + (ML20205H897)
- ST-HL-AE-2809, Annual Rept of Changes,Tests & Experiments Associated W/South Texas Project + (ML20205H898)
- PNO-I-99-016, on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve + (ML20205H899)
- ML20205H903 + (ML20205H903)
- ML20205H905 + (ML20205H905)
- ML20205H906 + (ML20205H906)
- ML20205H907 + (ML20205H907)
- ML20205H908 + (ML20205H908)
- ML20205H909 + (ML20205H909)
- ML20205H911 + (ML20205H911)
- ML20205H912 + (ML20205H912)
- ML20205H913 + (ML20205H913)
- ML20205H916 + (ML20205H916)