Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000354/1986018 + (ML20203P429)
- ML20203P431 + (ML20203P431)
- ML20203P434 + (ML20203P434)
- IR 05000334/1986002 + (ML20203P441)
- 05000331/LER-1986-009, :on 860329,w/reactor in Cold shutdown,one-half Group III Primary Containment Isolation & Standby Gas Treatment Sys Actuation Occurred During Outage Maint.Caused by Human Error + (ML20203P449)
- IR 05000529/1986007 + (ML20203P450)
- ML20203P453 + (ML20203P453)
- ML20203P455 + (ML20203P455)
- ML20203P458 + (ML20203P458)
- ML20203P468 + (ML20203P468)
- ML20203P471 + (ML20203P471)
- ML20203P472 + (ML20203P472)
- ML20203P476 + (ML20203P476)
- 05000361/LER-1986-008, :on 860331,while Performing Surveillance Procedure S023-3-3.25.1 in Mode 6,source-range Neutron Flux Monitor Audible Indicator Found Inoperable.Caused by Inexplicit Procedure.Procedure Revised + (ML20203P478)
- IR 05000373/1986007 + (ML20203P479)
- 05000331/LER-1986-011, :on 860401,during Scheduled Maint Outage,Main Steam Line Isolation Valve Hung Up in Partially Open Position.Caused by Metallurgical Flaw in Stellite on Junk Ring.Galling Removed from Ring & Valve + (ML20203P480)
- ML20203P488 + (ML20203P488)
- 3F0486-16, Annual Radiological Environ Operating Rept + (ML20203P490)
- ML20203P500 + (ML20203P500)
- ML20203P503 + (ML20203P503)
- ML20203P504 + (ML20203P504)
- ML20203P505 + (ML20203P505)
- ML20203P508 + (ML20203P508)
- IR 05000354/1986025 + (ML20203P510)
- TXX-4762, Interim Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Svc Water Sys.Initially Reported on 860124. Connected Pipe Nipple Lengthened to Add Flexibility & Eliminate Stress Riser.Final Rept Expected by 860730 + (ML20203P511)
- TXX-4764, Part 21 & Interim Deficiency Rept CP-86-15 Re Tdi Field Flash & K1 Relays Provided W/Rating That Does Not Meet Spec Requirements.Initially Reported on 860314.Evaluation Continuing.Next Rept Expected by 860516 + (ML20203P512)
- TXX-4523, Final Deficiency Rept SDAR-171 Re Reliance Electric Co Control Boards That Differ from Boards Described in Environ Qualification Rept.Initially Reported on 850226.Item Not Reportable Per 10CFR50.55(e) + (ML20203P517)
- ML20203P518 + (ML20203P518)
- ML20203P519 + (ML20203P519)
- ML20203P521 + (ML20203P521)
- ML20203P524 + (ML20203P524)
- TXX-4761, Final Deficiency Rept CP-85-45 Re Use of Core Boring Equipment During Installation of Shear Lugs.Initially Reported on 850926.Issue Not Reportable Per 10CFR50.55(e) + (ML20203P525)
- ML20203P529 + (ML20203P529)
- ML20203P531 + (ML20203P531)
- ML20203P532 + (ML20203P532)
- IR 05000020/1986001 + (ML20203P536)
- ML20203P537 + (ML20203P537)
- ML20203P540 + (ML20203P540)
- ML20203P541 + (ML20203P541)
- ML20203P548 + (ML20203P548)
- ML20203P551 + (ML20203P551)
- ML20203P552 + (ML20203P552)
- ML20203P553 + (ML20203P553)
- ML20203P555 + (ML20203P555)
- ML20203P556 + (ML20203P556)
- 05000327/LER-1986-010-01, :on 860406,fuse Inadvertently Dislodged, Starting Diesel Generators 1A-A & 2A-A.Caused When Assistant Unit Operator Attempted to Verify Fuse Size.Procedure Will Be Revised to Add Caution Re Fuse Removal + (ML20203P560)
- ML20203P563 + (ML20203P563)
- ML20203P564 + (ML20203P564)
- ML20203P568 + (ML20203P568)
- ML20203P569 + (ML20203P569)
- ML20203P571 + (ML20203P571)