Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202A942 + (ML20202A942)
- ML20202A946 + (ML20202A946)
- ML20202A947 + (ML20202A947)
- ML20202A948 + (ML20202A948)
- ML20202A949 + (ML20202A949)
- NSD-NRC-97-5447, Informs That Westinghouse Status for Open Item Tracking Sys Item 3943 Was Revised to Confirm W to Enusre Markup Was Incorporated Into SSAR Rev 14 + (ML20202A950)
- ML20202A951 + (ML20202A951)
- ML20202A953 + (ML20202A953)
- ML20202A955 + (ML20202A955)
- ML20202A958 + (ML20202A958)
- IR 07100116/2012027 + (ML20202A962)
- ML20202A965 + (ML20202A965)
- ML20202A967 + (ML20202A967)
- ML20202A968 + (ML20202A968)
- ML20202A969 + (ML20202A969)
- 05000445/LER-1997-009, :on 971027,reactor Trip Initiated Due to Main Turbine Generator Trip.Caused by Slow Operation of East Bus Supply Breaker.Inspected & Exercised East Bus Supply Breaker & Chartered Task Team to Evaluate Event + (ML20202A970)
- ML20202A972 + (ML20202A972)
- ML20202A973 + (ML20202A973)
- ML20202A974 + (ML20202A974)
- NSD-NRC-98-5555, Requests Meeting W/Nrc Mgt to Resolve Outstanding AP600 Fire Protection Issues,If Required + (ML20202A976)
- ML20202A977 + (ML20202A977)
- ML20202A978 + (ML20202A978)
- RC-98-0021, Provides Notification of Completion of GL 92-08 Re Thermo- Lag 330-1 Fire Barrier Systems Manufactured by Tsi.Actions Taken for Thermo-Lag 330-1 Electrical Barriers Applicable for App R Related Circuits,Listed + (ML20202A979)
- ML20202A980 + (ML20202A980)
- ML20202A983 + (ML20202A983)
- 05000528/LER-1986-038, :on 860603,technician Discovered Flow Rate Monitor & Sampler Flow Rate Measuring Device Daily Channel Checks Not Performed.Caused by Personnel Error.Radiation Protection Technicians Counseled Re Compliance + (ML20202A984)
- ML20202A986 + (ML20202A986)
- ML20202A987 + (ML20202A987)
- ML20202A988 + (ML20202A988)
- ML20202A989 + (ML20202A989)
- B16981, Informs NRC That SG Replacement,Implemented at Millstone Unit 2 in 1992,did Not Invalidate Applicability of TR CEN-367-A as Basis for LBB Evaluation of Primary Coolant Loop Piping + (ML20202A992)
- ML20202A995 + (ML20202A995)
- ML20202A997 + (ML20202A997)
- NG-97-1991, Forwards Response to RAI Re Request to Convert DAEC TS to Std TS (NUREG-1433).Commitment Made by Util,Provided + (ML20202A998)
- ML20202A999 + (ML20202A999)
- ML20202B000 + (ML20202B000)
- ML20202B001 + (ML20202B001)
- ML20202B002 + (ML20202B002)
- IR 05000458/1997011 + (ML20202B009)
- ML20202B012 + (ML20202B012)
- ML20202B014 + (ML20202B014)
- ML20202B015 + (ML20202B015)
- ML20202B018 + (ML20202B018)
- ML20202B019 + (ML20202B019)
- IR 05000282/1997019 + (ML20202B020)
- ML20202B021 + (ML20202B021)
- ML20202B023 + (ML20202B023)
- ML20202B024 + (ML20202B024)
- ML20202B025 + (ML20202B025)
- ML20202B027 + (ML20202B027)
- ML20202B029 + (ML20202B029)