Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199L652 + (ML20199L652)
- ML20199L654 + (ML20199L654)
- ML20199L657 + (ML20199L657)
- ML20199L660 + (ML20199L660)
- ML20199L661 + (ML20199L661)
- ML20199L662 + (ML20199L662)
- ML20199L663 + (ML20199L663)
- ML20199L664 + (ML20199L664)
- ML20199L665 + (ML20199L665)
- ML20199L666 + (ML20199L666)
- ML20199L667 + (ML20199L667)
- ML20199L670 + (ML20199L670)
- 05000458/LER-1997-009-01, :on 971016,inadequate Pressure Test Performance Was Noted.Caused by Inappropriate Testing Lineups.Llrt Valves,Were Retested Utilizing Revised Test Configurations + (ML20199L671)
- ML20199L672 + (ML20199L672)
- ML20199L675 + (ML20199L675)
- NOC-AE-0024, Provides Four Copies of ISI Summary Repts for Repairs, Replacements & Sys Pressure Tests Performed Between 960609 & Completion of Seventh Refueling Outage on 971004 + (ML20199L676)
- ML20199L681 + (ML20199L681)
- ML20199L683 + (ML20199L683)
- ML20199L684 + (ML20199L684)
- ML20199L685 + (ML20199L685)
- ML20199L686 + (ML20199L686)
- IR 05000348/1997017 + (ML20199L687)
- ML20199L691 + (ML20199L691)
- ML20199L692 + (ML20199L692)
- IR 05000302/1997021 + (ML20199L693)
- ML20199L695 + (ML20199L695)
- ML20199L699 + (ML20199L699)
- ML20199L700 + (ML20199L700)
- IR 015000031/1997004 + (ML20199L702)
- ML20199L703 + (ML20199L703)
- LIC-98-0009, Forwards Application for Amend to License DPR-40,requesting Deletion of Section 3.E,license Term,Which Requires Monitoring of Long Term Load Factor & Reevaluation of End of License Fluence w/ENDF/B-VI Cross Sections,From License + (ML20199L706)
- 05000395/LER-1997-005, :on 971024,failure to Perform ASME Section XI Code Surveillance Test at Increased Frequency Noted.Caused by Personnel Confusion.Review Was Performed to Determine If Procedural Guidance Was Clear Enough + (ML20199L708)
- ML20199L709 + (ML20199L709)
- ML20199L710 + (ML20199L710)
- ML20199L715 + (ML20199L715)
- ML20199L716 + (ML20199L716)
- ML20199L717 + (ML20199L717)
- ML20199L718 + (ML20199L718)
- ML20199L720 + (ML20199L720)
- ML20199L721 + (ML20199L721)
- ML20199L722 + (ML20199L722)
- ML20199L724 + (ML20199L724)
- 05000302/LER-1979-005-01, Discusses Commitment Stated in LER 79-005-01T-1 Re MSIV Valves Not Closing within Design Time of Five Seconds During Double Ended Pipe Rupture.Util Has Determined That Upgrading Air Circuit to Seismic Class I Will Not Be Nec + (ML20199L725)
- ML20199L727 + (ML20199L727)
- ML20199L729 + (ML20199L729)
- ML20199L730 + (ML20199L730)
- ML20199L731 + (ML20199L731)
- ML20199L732 + (ML20199L732)
- BVY-97-159, Submits Response to Items Identified in Insp Rept 50-271/97-06 Re Schedule Associated W/Util EOP Program + (ML20199L735)
- ML20199L737 + (ML20199L737)
- 05000266/LER-1997-041, :on 971023,potential Common Mode Failure in Afws Control Circuits Was Noted.Caused by AFW Control Circuits Installed by Plant Mods.Temporary Mods Will Restore Physical Separation for Cables + (ML20199L738)