Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199J456 + (ML20199J456)
- ML20199J457 + (ML20199J457)
- ML20199J458 + (ML20199J458)
- ML20199J459 + (ML20199J459)
- 05000454/LER-1986-017-03, :on 860602,both Trains of Main Control Room Ventilation Sys Inoperable.Caused by Setpoint Drift on Train a Makeup Fan & Bent Spring Release on Train B Supply Fan Breaker.Setpoint Recalibr & Spring Repaired + (ML20199J460)
- ML20199J462 + (ML20199J462)
- ML20199J463 + (ML20199J463)
- ML20199J464 + (ML20199J464)
- ML20199J465 + (ML20199J465)
- ML20199J466 + (ML20199J466)
- 05000282/LER-1997-013, :on 971018,inoperability of AFW & Entry Into TS 3.0.C Was Noted Due to AFW Manual Start During Planned & Orderly Shutdown.Lar Will Be Prepared + (ML20199J468)
- ML20199J469 + (ML20199J469)
- ML20199J470 + (ML20199J470)
- 05000298/LER-1986-012, :on 860610,during Normal Operation,Loss of 69-kV Power Supply to Emergency Transformer Occurred.Caused by Substation Breaker Trip.Power Restored.Emergency Transformer Declared Operable + (ML20199J471)
- ML20199J472 + (ML20199J472)
- ML20199J473 + (ML20199J473)
- ML20199J475 + (ML20199J475)
- ML20199J476 + (ML20199J476)
- ML20199J477 + (ML20199J477)
- ML20199J478 + (ML20199J478)
- ML20199J480 + (ML20199J480)
- BSEP-98-0012, Forwards Response to Request for Addl Info & Suppl to Request for License Amends for DG Surveillance Requirements. Procedures Encl + (ML20199J481)
- ML20199J487 + (ML20199J487)
- ML20199J488 + (ML20199J488)
- ML20199J489 + (ML20199J489)
- NOC-AE-000016, Requests That NRC Change Distribution Lists for Transmittals Re Plant as Listed + (ML20199J490)
- ML20199J492 + (ML20199J492)
- ML20199J493 + (ML20199J493)
- ML20199J494 + (ML20199J494)
- ML20199J499 + (ML20199J499)
- ML20199J501 + (ML20199J501)
- ML20199J504 + (ML20199J504)
- ML20199J505 + (ML20199J505)
- ML20199J507 + (ML20199J507)
- ML20199J509 + (ML20199J509)
- ML20199J514 + (ML20199J514)
- ML20199J518 + (ML20199J518)
- ML20199J523 + (ML20199J523)
- ML20199J524 + (ML20199J524)
- ML20199J526 + (ML20199J526)
- U-602874, Reports Impact of Changes & Errors in ECCS Evaluation Methodology Used for Cps,Per 10CFR50.46(a)(3)(ii) + (ML20199J527)
- ML20199J528 + (ML20199J528)
- ML20199J532 + (ML20199J532)
- IR 05000298/1986012 + (ML20199J533)
- ML20199J534 + (ML20199J534)
- ML20199J535 + (ML20199J535)
- ML20199J537 + (ML20199J537)
- ML20199J539 + (ML20199J539)
- ML20199J540 + (ML20199J540)
- SVP-97-265, Informs NRC of Utils Plans to Address Concerns Re IHSI Process Discussed in Ser,Dtd 960510.Number of GL 88-01 Category C Welds Were Found to Be Flawed W/Igscc.List of Subject Welds to Be Inspected IAW Category D Schedule,Encl + (ML20199J543)
- ML20199J545 + (ML20199J545)