Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199D172 + (ML20199D172)
- ML20199D173 + (ML20199D173)
- PNO-III-99-058B, second Update on 981209 Fire in Process Bldg.Exit Meeting on 990205 Rescheduled from 990108 Due to Severe Weather.Cause of Fire Still Being Investigated by Usec.Some Release of Hex in Process Bldg Occurred + (ML20199D180)
- ML20199D182 + (ML20199D182)
- PNO-I-99-002, on 990113,Defense Logistics Agency (DLA) Representative Notified Region I That Package Received with Removable Contamination in Excess of Applicable Limits at Anniston Army Depot Facilities in AL on 990104 + (ML20199D186)
- ML20199D189 + (ML20199D189)
- ML20199D193 + (ML20199D193)
- TXX-9724, Forwards MOR for CPSES for Oct 1997.Unit 2 Power Relief Valves Opened After Unit Was Cooled Down to LTOP Arming Temperature (350 Degrees) W/Pressure Above LTOP Setpoint + (ML20199D199)
- ML20199D206 + (ML20199D206)
- 05000528/LER-1986-028, :on 860516,determined That Previous Testing Performed on Halon Portion of Fire Protection Sys Did Not Fulfill Tech Specs as Storage Tanks Could Not Be Calibr. Caused by Personnel Error.Fire Watch Posted + (ML20199D207)
- ML20199D208 + (ML20199D208)
- ML20199D210 + (ML20199D210)
- ML20199D212 + (ML20199D212)
- ML20199D214 + (ML20199D214)
- ML20199D215 + (ML20199D215)
- ML20199D216 + (ML20199D216)
- ML20199D225 + (ML20199D225)
- ML20199D226 + (ML20199D226)
- ML20199D229 + (ML20199D229)
- ML20199D231 + (ML20199D231)
- ML20199D234 + (ML20199D234)
- ML20199D238 + (ML20199D238)
- ML20199D242 + (ML20199D242)
- ML20199D244 + (ML20199D244)
- ML20199D246 + (ML20199D246)
- ML20199D247 + (ML20199D247)
- 05000341/LER-1986-014, :on 860516,while Refueling,Offsite Ac Power to Div 2 Interrupted,Causing half-scram.Caused by Personnel Procedural error.Half-scram Reset & Sys Restored + (ML20199D250)
- IR 05000373/1997018 + (ML20199D256)
- ML20199D259 + (ML20199D259)
- ML20199D260 + (ML20199D260)
- ML20199D261 + (ML20199D261)
- ML20199D263 + (ML20199D263)
- ML20199D265 + (ML20199D265)
- ML20199D268 + (ML20199D268)
- ML20199D269 + (ML20199D269)
- ML20199D272 + (ML20199D272)
- ML20199D274 + (ML20199D274)
- ML20199D279 + (ML20199D279)
- ML20199D280 + (ML20199D280)
- ML20199D281 + (ML20199D281)
- ML20199D282 + (ML20199D282)
- ML20199D283 + (ML20199D283)
- ML20199D290 + (ML20199D290)
- ML20199D294 + (ML20199D294)
- 3F0198-21, Responds to NRC Re Violations Noted in Insp Rept 50-302/97-17.Corrective Actions:Revised B EDG Functional Test Procedure Safety Assessment + (ML20199D298)
- DD-97-26, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-97-26 Has Expired.Decison Became Final Agency Action on 980123. W/Certificate of Svc.Served on 980128 + (ML20199D301)
- ML20199D302 + (ML20199D302)
- ML20199D304 + (ML20199D304)
- ML20199D309 + (ML20199D309)
- ML20199D315 + (ML20199D315)
- ML20199D316 + (ML20199D316)