Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198S853 + (ML20198S853)
- ML20198S854 + (ML20198S854)
- ML20198S857 + (ML20198S857)
- ML20198S858 + (ML20198S858)
- NSD-NRC-97-5415, Forwards AP600 TS 3.3.1 & 3.3.2,incorporating NRC Comments Resolved During 971027 Telcon.Ts Changes Will Be Incorporated in Rev 8 & SSAR Markups Will Be Included in Next SSAR Rev.Open Item 6152 Is Statused Confirm-W + (ML20198S859)
- ML20198S860 + (ML20198S860)
- ML20198S861 + (ML20198S861)
- ML20198S865 + (ML20198S865)
- ML20198S868 + (ML20198S868)
- ML20198S869 + (ML20198S869)
- ML20198S872 + (ML20198S872)
- ML20198S873 + (ML20198S873)
- ML20198S874 + (ML20198S874)
- ML20198S877 + (ML20198S877)
- ML20198S878 + (ML20198S878)
- ML20198S879 + (ML20198S879)
- 05000440/LER-1986-011, :on 860503-05 & 0516-17,gaseous Effluent Vent Stack Flow Estimates Not Performed Every 4 H.Caused by Personnel Error.Personnel Will Be Trained & Counseled + (ML20198S880)
- 05000454/LER-1997-017-03, :on 971009,completion of Shutdown Was Initiated.Caused by Degraded Condition of Safety Injection Sys Found.Caused by Failure of Cold Leg Check Valve. Leak-rate Determination Performed + (ML20198S884)
- ML20198S886 + (ML20198S886)
- PNO-I-97-065A, on 971018,Troxler Model 3430 Moisture/Density Gauge Had Been Stolen.Gauge Recovered by Ny Long Island Suffolk County Police on 971112 in Brentwood,Long Island. Police Transported Gauge to Brookhaven Natl Lab for Exam + (ML20198S888)
- ML20198S889 + (ML20198S889)
- ML20198S890 + (ML20198S890)
- ML20198S893 + (ML20198S893)
- ML20198S895 + (ML20198S895)
- ML20198S896 + (ML20198S896)
- 05000304/LER-1997-002-09, :on 971012,inadvertent Isolation of Svc Water Cooling to 2B DG During Sys Alignment,Occurred.Caused by Shift Mgt Not Ensuring All Operability Requirements Met. Valve 2MOV-SW0023 Opened to Restore Flow to 2B EDG + (ML20198S897)
- ML20198S898 + (ML20198S898)
- 3F1197-09, Provides Description of Control Complex Habitability Envelope Inleakage Testing & Revisions to Calculational Methodology Used for Determining CR Operator Dose at Plant, Unit 3.W/plan for Resolving Discrepancies & Commitments + (ML20198S902)
- ML20198S905 + (ML20198S905)
- ML20198S907 + (ML20198S907)
- 3F0198-35, Forwards Complete Updated TS & Bases Pages to TS Change Request Notice 210 Submitted on 970614.Updated Pages Reflect Changes Identified in Licensee ,Correction of Typo & Addition of Footnotes + (ML20198S908)
- ML20198S911 + (ML20198S911)
- ML20198S915 + (ML20198S915)
- ML20198S917 + (ML20198S917)
- ML20198S918 + (ML20198S918)
- IR 05000361/1998014 + (ML20198S920)
- ML20198S921 + (ML20198S921)
- ML20198S923 + (ML20198S923)
- ML20198S924 + (ML20198S924)
- ML20198S925 + (ML20198S925)
- ML20198S926 + (ML20198S926)
- ML20198S927 + (ML20198S927)
- ML20198S928 + (ML20198S928)
- ML20198S929 + (ML20198S929)
- ML20198S930 + (ML20198S930)
- ML20198S931 + (ML20198S931)
- ML20198S934 + (ML20198S934)
- ML20198S937 + (ML20198S937)
- ML20198S938 + (ML20198S938)
- ML20198S939 + (ML20198S939)
- ML20198S940 + (ML20198S940)