Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198B918 + (ML20198B918)
- ML20198B919 + (ML20198B919)
- IA-90-568, Responds to 910425 Ltr Appealing Denial of FOIA Request for Document Identified as C-2 in 910326 Response to Request for Documents Re Facility.Forwards Document.W/O Encl + (ML20198B920)
- ML20198B920 + (ML20198B920)
- PNO-II-97-066, on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc + (ML20198B923)
- RBG-22536, Submits Info in Response to Equipment Qualification Branch Request Re long-term Availability of Valve Operator Motors Employing Magnesium Rotors.Condition Addressed by Util in 850724 Rept Re Reliance Class Rh Ac Motors + (ML20198B924)
- ML20198B926 + (ML20198B926)
- ML20198B927 + (ML20198B927)
- RBG-22-496, Forwards Revs to 851021 Tech Spec Change Request for Full Power Ol,Based on Discussion W/Nrc.Revs Clarify Basis for Changing ECCS Actuation Instrumentation Setpoints for Fire Detection Instrumentation + (ML20198B928)
- ML20198B930 + (ML20198B930)
- ML20198B931 + (ML20198B931)
- ML20198B932 + (ML20198B932)
- L-97-034, Forwards Cycle 13 Reload & COLR, Updated to Include New Radial Peaking Factor at Rated Thermal Power Limits for Unrodded Core Planes.Cycle 13 Reload Design,Discussed + (ML20198B933)
- ML20198B938 + (ML20198B938)
- ML20198B939 + (ML20198B939)
- ML20198B941 + (ML20198B941)
- ML20198B943 + (ML20198B943)
- ML20198B946 + (ML20198B946)
- HBL-86-017, Application for Amend to License DPR-7,consisting of License Amend Request 86-02,upgrading Capabilities of Stack Gas Monitoring Sys & Reducing Number of Condensate Demineralizer Beds + (ML20198B948)
- ML20198B951 + (ML20198B951)
- ML20198B952 + (ML20198B952)
- 3F1298-16, Provides Summary of Review Performed by Licensee for Calculations & Analyses That Supported Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (ML20198B954)
- ML20198B956 + (ML20198B956)
- ML20198B959 + (ML20198B959)
- 05000443/LER-1998-010, :on 981113,plant Placed in Cold Shutdown Condition Due to Degraded Generator step-up Transformer Connection.Visual Insp of Damaged Transformer Connections Performed to Determine Cause of Event.With + (ML20198B962)
- RBG-22458, Forwards Revised FSAR Pages,Reflecting Changes in Implementation of Loading of Div I & II Standby Diesel Generators.Two Loads Reduced Below Projected Levels Per But Meet Original Design Criterion + (ML20198B963)
- ML20198B965 + (ML20198B965)
- IR 05000029/1985015 + (ML20198B966)
- ML20198B967 + (ML20198B967)
- ML20198B968 + (ML20198B968)
- ML20198B973 + (ML20198B973)
- ML20198B974 + (ML20198B974)
- ML20198B977 + (ML20198B977)
- B17553, Responds to NRC Re Violations Noted in Insp Rept 50-336/98-213.Corrective Actions:Applicable Plant Operating Procedures Will Be Revised to Ensure That Feedwater Regulating Bypass Valves Are Maintained.With Commitments + (ML20198B980)
- ML20198B981 + (ML20198B981)
- ML20198B985 + (ML20198B985)
- ML20198B986 + (ML20198B986)
- ML20198B987 + (ML20198B987)
- TXX-9727, Submits Response to 970828 RAI Re Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Commitments Made by Util,Encl + (ML20198B989)
- ML20198B992 + (ML20198B992)
- ML20198B999 + (ML20198B999)
- 0CAN129805, LER 98-S02-00:on 981124,security Officer Found Not to Have Had Control of Weapon for Period of Approx 3 Minutes Due to Inadequate self-checking to Ensure That Weapon Remained Secure.All Security Officers Briefed.With + (ML20198C000)
- ML20198C001 + (ML20198C001)
- ML20198C003 + (ML20198C003)
- ML20198C005 + (ML20198C005)
- ML20198C007 + (ML20198C007)
- ML20198C008 + (ML20198C008)
- ML20198C012 + (ML20198C012)
- ML20198C014 + (ML20198C014)
- ML20198C017 + (ML20198C017)
- L-98-221, Forwards Proposed Change to BVPS QAP Description Included in Unit 2 Ufsar,For Approval.Change Will Reduce QAP Description Commitments for Units 1 & 2 by Allowing Conditional Release to Site of Matl & Equipment + (ML20198C018)