Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198B677 + (ML20198B677)
- ML20198B678 + (ML20198B678)
- PNO-I-86-038A, on 860515,operations,maint & Clerical Workers Went on Strike When Contract Expired.Mgt Personnel W/Senior Reactor Licenses Manning Control Room Watches on 12-h Shifts.Work Activities Canceled for Several Days + (ML20198B681)
- ML20198B682 + (ML20198B682)
- ML20198B686 + (ML20198B686)
- ML20198B687 + (ML20198B687)
- ML20198B689 + (ML20198B689)
- ML20198B693 + (ML20198B693)
- NOC-AE-000038, Submits 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (ML20198B694)
- ML20198B696 + (ML20198B696)
- ML20198B699 + (ML20198B699)
- ML20198B700 + (ML20198B700)
- U-600304, Forwards Preliminary Analysis of Clinton Power Station Hydrogen Control Sys + (ML20198B702)
- ML20198B704 + (ML20198B704)
- ML20198B709 + (ML20198B709)
- ML20198B710 + (ML20198B710)
- ML20198B711 + (ML20198B711)
- ML20198B712 + (ML20198B712)
- ML20198B713 + (ML20198B713)
- ML20198B718 + (ML20198B718)
- ML20198B720 + (ML20198B720)
- ML20198B725 + (ML20198B725)
- ML20198B727 + (ML20198B727)
- ML20198B731 + (ML20198B731)
- 0CAN108504, Forwards Response to 850807 Request for Addl Info to Complete Review of SPDS Per Suppl 1 to NUREG-0737 + (ML20198B733)
- BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn + (ML20198B735)
- ML20198B736 + (ML20198B736)
- ML20198B737 + (ML20198B737)
- ML20198B740 + (ML20198B740)
- ML20198B742 + (ML20198B742)
- ML20198B743 + (ML20198B743)
- ML20198B747 + (ML20198B747)
- 05000322/LER-1985-045, :on 850925,Loop B of LPCI Sys of RHR Sys Declared Inoperable.Possibly Caused by Min Flow Control Valve Vibration Due to Cavitation in Suppression Pool Test Return Line.Studies Being Performed + (ML20198B753)
- W3P86-0082, Proposes Changes to Audit & Annual Evaluation Procedures for Security Program.Annual Audit Will Be Separated Into Three Audits:Administration/Program,Hardware/Maint & Contingency Plans & Operations + (ML20198B754)
- ML20198B755 + (ML20198B755)
- ML20198B758 + (ML20198B758)
- ML20198B760 + (ML20198B760)
- ML20198B761 + (ML20198B761)
- ML20198B763 + (ML20198B763)
- ML20198B764 + (ML20198B764)
- ML20198B765 + (ML20198B765)
- 05000220/LER-1998-019-01, :on 981110,ASME Section XI ISI Was Missed. Caused by Cognitive Error Involving Technical Inaccuracies. Util Will Revise Second 10-yr Interval ISI Program Plan to Incorporate Visual Exam Requirements.With + (ML20198B768)
- ML20198B769 + (ML20198B769)
- ML20198B770 + (ML20198B770)
- ML20198B772 + (ML20198B772)
- ML20198B773 + (ML20198B773)
- ML20198B775 + (ML20198B775)
- ML20198B778 + (ML20198B778)
- ML20198B781 + (ML20198B781)
- ML20198B785 + (ML20198B785)
- ML20198B786 + (ML20198B786)