Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197B937 + (ML20197B937)
- IR 05000219/1997008 + (ML20197B938)
- ML20197B939 + (ML20197B939)
- 05000293/LER-1978-047, Forwards LER 78-047/03L-0 + (ML20197B941)
- ML20197B946 + (ML20197B946)
- ML20197B949 + (ML20197B949)
- ML20197B950 + (ML20197B950)
- 05000272/LER-1986-007, :on 860408,discovered That Several motor-operated Valves Inside Containment Not in Compliance w/10CFR50.49 Due to T-drains Not Being Installed.Caused by Design Change Package Omissions + (ML20197B951)
- 05000293/LER-1978-047-03, /03L-0 on 781002:Position of Chief Radiol Engr Was Incorp Into PNPS Organization Which Assumed Responsibilities of Health Physics Organization.Caused by Efforts to Improve Quality of Health Physics Prog + (ML20197B953)
- NSD-NRC-98-5748, Forwards Rev 24 of AP600 Ssar.Revised Tables of Contents, Change Page Instructions,List of Effective Pages,Document Cover Sheet & Change Roadmap Outlining Changes in Each Section Also Encl.Rev Submitted Under Encl Oath + (ML20197B956)
- ML20197B957 + (ML20197B957)
- ML20197B959 + (ML20197B959)
- ML20197B963 + (ML20197B963)
- ML20197B964 + (ML20197B964)
- B12075, Responds to 860319 Request for Further Clarification of Util Intent to Use ASME Code Case N-397 Re Peak Shifting in Combination W/Independent Support Motion Response Spectra Motion,Per SEP Topic III-6 Re Seismic Design Considerations + (ML20197B969)
- ML20197B970 + (ML20197B970)
- ML20197B972 + (ML20197B972)
- ML20197B973 + (ML20197B973)
- ML20197B980 + (ML20197B980)
- ST-HL-AE-1655, Part 21 & Final Deficiency Rept Re Damaged multi-pin Plug Type Electrical Connectors to Class 1E Westinghouse Solid State Protection Sys Cabinets.Initially Reported on 860310. Plug Procedures Revised & Insp Program Implemented + (ML20197B984)
- ML20197B985 + (ML20197B985)
- TXX-6026, Interim Deficiency Rept CP-86-61 Re Restraints for Polar Crane.Initially Reported on 860904.Evaluation Continuing. Next Rept Will Be Submitted by 861219 + (ML20197B987)
- ML20197B990 + (ML20197B990)
- ML20197B991 + (ML20197B991)
- ML20197B992 + (ML20197B992)
- 05000312/LER-1978-016, Forwards LER 78-016/01T-0 + (ML20197B995)
- ML20197B997 + (ML20197B997)
- ML20197C000 + (ML20197C000)
- 05000312/LER-1978-016-01, /01T-0:on 781024,operability of a Diesel Generator Lost Due to Failure of Primary Fuses on the Voltage Regulators Control Power Circuit.Fuses Replaced,A Generator Tested Then Returned to Svc + (ML20197C003)
- ML20197C004 + (ML20197C004)
- ML20197C006 + (ML20197C006)
- ML20197C008 + (ML20197C008)
- IR 05000285/1986024 + (ML20197C011)
- 05000366/LER-1978-051, Forwards LER 78-051/03L-0 + (ML20197C012)
- ML20197C015 + (ML20197C015)
- 05000366/LER-1978-051-03, /03L-0 on 781017:during Startup Testing While Calibrating APRM High Flux Scram Setpoints,Discerned That Trip Setpoints Were Set in Excess of Reg Guide Criteria. Caused by Deficiency in Procedures + (ML20197C019)
- NPL-97-0800, Forwards Updated Pbnp ASME Section XI Periodic Pressure Test Program Third Interval. Following Completion of Detailed Review of Program,Revised Third Interval Pressure Test Program Will Be Submitted + (ML20197C021)
- ML20197C027 + (ML20197C027)
- IR 05000348/1978023 + (ML20197C029)
- IR 05000062/1986001 + (ML20197C030)
- ML20197C030 + (ML20197C030)
- ML20197C031 + (ML20197C031)
- ML20197C033 + (ML20197C033)
- ML20197C037 + (ML20197C037)
- ML20197C040 + (ML20197C040)
- ML20197C041 + (ML20197C041)
- ML20197C045 + (ML20197C045)
- 05000321/LER-1986-016, :on 860404,reactor Protection Sys Logic Actuation Occurred.Caused by Main Steam Line Radiation Monitor Failing Downscale.Monitor Repaired by Adjusting High Voltage Inoperable Trip Setpoint + (ML20197C047)
- ML20197C049 + (ML20197C049)
- 05000244/LER-1986-007, :on 860922,review of 1986 Surveillance Testing Schedule Identified Fire Detection Surveillance Interval Exceeded.Caused by Personnel Error.Comprehensive Review of Testing Schedule Conducted + (ML20197C050)
- ML20197C051 + (ML20197C051)