Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155C774 + (ML20155C774)
- ML20155C775 + (ML20155C775)
- ML20155C777 + (ML20155C777)
- ML20155C779 + (ML20155C779)
- ML20155C781 + (ML20155C781)
- ML20155C783 + (ML20155C783)
- ML20155C786 + (ML20155C786)
- ML20155C788 + (ML20155C788)
- ML20155C789 + (ML20155C789)
- ML20155C794 + (ML20155C794)
- ML20155C795 + (ML20155C795)
- ML20155C798 + (ML20155C798)
- ML20155C800 + (ML20155C800)
- HBL-88-055, Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination + (ML20155C804)
- ML20155C806 + (ML20155C806)
- ML20155C811 + (ML20155C811)
- ML20155C812 + (ML20155C812)
- ST-HL-AE-2797, Forwards Documentation Re Review of City of Austin Vs Houston Lighting & Power & Houston Industries.Encl Describes Scope & Methodology of Program Initiated on 880725.NRC Participation in Litigation Review Program Welcomed + (ML20155C814)
- IA-98-246, Agrees with Recommendations Re I&E Investigation of Stepan Chemical Co.Discussion Suggested to Go Beyond Stepan Case to Listed Generic Issues + (ML20155C816)
- ML20155C816 + (ML20155C816)
- PNO-IV-88-081, on 880930,two of Eight Solenoid Operated Valves Failed During Test of MSIVs Per Info Notice 88-043. Reactor Shutdown Commenced from 4 to 7 Days + (ML20155C817)
- ML20155C818 + (ML20155C818)
- ML20155C819 + (ML20155C819)
- ML20155C821 + (ML20155C821)
- ML20155C823 + (ML20155C823)
- B12916, Provides Info Re Schedule for Cycle 10 Reload & Related Safety Analysis Submittals.Nrc Notification Requested by 880630 of Any Significant Obstacles in Obtaining Issuance of License Amend by 880630 + (ML20155C828)
- ML20155C829 + (ML20155C829)
- ML20155C830 + (ML20155C830)
- ML20155C833 + (ML20155C833)
- ML20155C834 + (ML20155C834)
- B12935, Forwards Proposed Methodology to Resolve SEP Topics III-2 & III-4.A,per 880407 Meeting W/Nrc.Util Has Determined That Proposed Methodology Utilizing Probabilistic Techniques Is Sound & Reasonable as Means of Resolution of Topics + (ML20155C835)
- ML20155C835 + (ML20155C835)
- ML20155C836 + (ML20155C836)
- ML20155C842 + (ML20155C842)
- ML20155C844 + (ML20155C844)
- ML20155C846 + (ML20155C846)
- ML20155C851 + (ML20155C851)
- ML20155C852 + (ML20155C852)
- ML20155C853 + (ML20155C853)
- 05000373/LER-1986-002-01, :on 860120,Wyle Lab Test Results Determined That Main Steam Safety Relief Valves E,H & U Failed to Meet Setpoint Tolerance Per Tech Specs.Caused by Seat Leakage. Valve Setpoints Adjusted to Nameplate + (ML20155C855)
- ML20155C856 + (ML20155C856)
- ML20155C858 + (ML20155C858)
- ML20155C860 + (ML20155C860)
- ML20155C862 + (ML20155C862)
- ML20155C863 + (ML20155C863)
- ML20155C865 + (ML20155C865)
- IR 05000483/1988007 + (ML20155C866)
- ML20155C869 + (ML20155C869)
- ML20155C870 + (ML20155C870)
- RBG-28012, Special Rept:On 880503,invalid Failure of Division II Diesel Generator (DG) Occurred.Caused by Circuit Breaker Serving Ventilation Exhaust Fan 1HVP*FN2B Failure to Close.Subj Breaker Loosened from Binding,Tested & Reinstalled + (ML20155C873)
- ML20155C876 + (ML20155C876)