Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154C055 + (ML20154C055)
- ML20154C056 + (ML20154C056)
- ML20154C057 + (ML20154C057)
- ML20154C058 + (ML20154C058)
- ML20154C059 + (ML20154C059)
- ML20154C061 + (ML20154C061)
- ML20154C065 + (ML20154C065)
- ML20154C068 + (ML20154C068)
- ML20154C069 + (ML20154C069)
- ML20154C071 + (ML20154C071)
- NOC-AE-000243, Requests Relief from IWA 5250 of Section XI of ASME B&PV Code,In Order to Defer Code Repair of Flaw Recently Identified in Svc Water Class 3 Piping + (ML20154C072)
- ML20154C073 + (ML20154C073)
- ML20154C074 + (ML20154C074)
- ML20154C075 + (ML20154C075)
- ML20154C076 + (ML20154C076)
- CEO-88-132, Forwards Supplemental Response Supporting Util Denial of Notice of Violation from Insp Rept 50-312/88-05.Addl Discussion Re Actions Taken by Util During Tdi Diesel Generator Testing Also Provided + (ML20154C077)
- ML20154C080 + (ML20154C080)
- ML20154C081 + (ML20154C081)
- ML20154C082 + (ML20154C082)
- ML20154C083 + (ML20154C083)
- ML20154C084 + (ML20154C084)
- ML20154C085 + (ML20154C085)
- ML20154C086 + (ML20154C086)
- RBG-28772, Responds to NRC Bulletin 88-007 Re Power Oscillations in Bwrs.All Action Items Completed & Implemented at Plant. Abnormal Operating Procedure AOP-0024 Revised & Operator/ Shift Technical Advisor Training Session Developed + (ML20154C090)
- B17457, Certifies That DE Rowe Completed Required Portions of Licensed Operator Initial Training Program.Reactivity Manipulations for DE Rowe Encl + (ML20154C092)
- ML20154C093 + (ML20154C093)
- IA-87-829, Package Consisting of NRC Operator Licensing Tracking Licensed Operator Educ Levels + (ML20154C096)
- ML20154C096 + (ML20154C096)
- ML20154C102 + (ML20154C102)
- ML20154C103 + (ML20154C103)
- ML20154C105 + (ML20154C105)
- 05000341/LER-1998-005, :on 980904,unplanned Manual Reactor Scram Occurred in Response to Reactor Power Fluctuations.Caused by Spindle/Tongue Degradation of Number 3 Hpt Cv.Spindles, Tongues & Locking Plates Were Replaced on Subject Cvs + (ML20154C107)
- ML20154C108 + (ML20154C108)
- ML20154C109 + (ML20154C109)
- ML20154C111 + (ML20154C111)
- ML20154C113 + (ML20154C113)
- 05000413/LER-1988-015, :on 880309,degraded Performance of Unit 1 Auxiliary Feedwater Sys & Required Hot Shutdown of Both Units Occurred After Unit 2 Tripped from 20% Full Power. Caused by Asiatic Clam Infestation + (ML20154C114)
- ML20154C115 + (ML20154C115)
- ML20154C116 + (ML20154C116)
- ML20154C119 + (ML20154C119)
- ML20154C120 + (ML20154C120)
- ML20154C126 + (ML20154C126)
- 05000483/LER-1998-009, :on 960830,potential for Inadequate Guidance for Safe Shutdown During Fire Requiring CR Evacuation Noted. Caused by Inadvertent Deletion of Required ACs During Procedure Rev.Revised Appropriate Procedure.With + (ML20154C127)
- ML20154C128 + (ML20154C128)
- 3F0998-11, Forwards LAR 238 to License DPR-72,correcting RCS Leakage Detection Capability of RB Atmosphere Gaseous Radioactivity Monitor Described in ITS Bases & FSAR + (ML20154C131)
- ML20154C133 + (ML20154C133)
- ML20154C134 + (ML20154C134)
- ML20154C137 + (ML20154C137)
- ML20154C138 + (ML20154C138)
- ML20154C139 + (ML20154C139)
- ML20154C140 + (ML20154C140)
- ML20154C142 + (ML20154C142)