Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20147B491 + (ML20147B491)
- ML20147B494 + (ML20147B494)
- ML20147B495 + (ML20147B495)
- PNO-III-97-006, on 970129,inspector Learned That 12 Muzzle Reference Sensors Were Missing from Shipment of Refurbished Devices & Licensee Did Not Make Rept to Nrc.Licensee Search & Investigation for Sensors Continuing + (ML20147B496)
- ML20147B500 + (ML20147B500)
- ML20147B505 + (ML20147B505)
- 05000269/LER-1987-011-04, :on 871202,cable Room Sprinkler Sys Could Not Provide Design Flow.Caused by Design Deficiency.Fire Watches Established Until Sys Operable,Restoring Sys to Operable Condition by Increasing Supply Line Diameter + (ML20147B506)
- ML20147B508 + (ML20147B508)
- ML20147B510 + (ML20147B510)
- ML20147B513 + (ML20147B513)
- ML20147B514 + (ML20147B514)
- ML20147B516 + (ML20147B516)
- ML20147B517 + (ML20147B517)
- ML20147B518 + (ML20147B518)
- NRC-87-0232, Responds to NRC Re Violations Noted in Insp Rept 50-341/87-44.Corrective Actions:Procedures 44.020.235 & 44.020.236 Revised to Verify Continuity of Parallel Contact to Overlap Between Relays E51-K58,E51-K59 & E51-K60,E51-K61 + (ML20147B519)
- ML20147B522 + (ML20147B522)
- ML20147B523 + (ML20147B523)
- ML20147B524 + (ML20147B524)
- ML20147B528 + (ML20147B528)
- ML20147B530 + (ML20147B530)
- ML20147B531 + (ML20147B531)
- ML20147B533 + (ML20147B533)
- ML20147B534 + (ML20147B534)
- ML20147B538 + (ML20147B538)
- ML20147B540 + (ML20147B540)
- PM-78-524, Forwards Monthly Oper Rept for Nov 1978 + (ML20147B541)
- ML20147B542 + (ML20147B542)
- ML20147B543 + (ML20147B543)
- ML20147B544 + (ML20147B544)
- ML20147B545 + (ML20147B545)
- ML20147B546 + (ML20147B546)
- ML20147B549 + (ML20147B549)
- ML20147B551 + (ML20147B551)
- ML20147B552 + (ML20147B552)
- ML20147B557 + (ML20147B557)
- IA-80-572, Responds to 780725 & 780804 Ltrs Re low-level Radioactive Waste Disposal.Claims the NRC Is Seeking a Contingency Plan to Assure Adequate Capacity,But That They Are Not Attempting to Federalize the Commercial Disposal Industry + (ML20147B557)
- ML20147B560 + (ML20147B560)
- ML20147B561 + (ML20147B561)
- ML20147B563 + (ML20147B563)
- ML20147B566 + (ML20147B566)
- A06958, Confirms 880515 Revised Due Date for Util Response to NRC Request for Addl Info Re Inservice Insp Program,Per Telcons W/Facility Project Manager + (ML20147B567)
- ML20147B568 + (ML20147B568)
- ML20147B569 + (ML20147B569)
- ML20147B571 + (ML20147B571)
- ML20147B573 + (ML20147B573)
- ML20147B574 + (ML20147B574)
- ML20147B576 + (ML20147B576)
- ML20147B577 + (ML20147B577)
- ML20147B582 + (ML20147B582)
- ML20147B591 + (ML20147B591)
- ML20147B592 + (ML20147B592)