Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-III-97-050, on 970517,Am-241 Source Discovered During Scrap Yard Search.Licensee Placed Source in Secured Storage Pending Determination of Source Mfg.Nrc Region III Currently Investigating Source Origin + (ML20141D901)
- ML20141D904 + (ML20141D904)
- 3F0597-11, Provides Response to NRC Requests Contained in Re Control Room Emergency Ventilation Sys & Control Complete Habitability Envelope + (ML20141D906)
- ML20141D909 + (ML20141D909)
- IR 05000263/1996011 + (ML20141D910)
- ML20141D912 + (ML20141D912)
- HL-5411, Forwards Response to Request for Addl Info Re Spent Fuel Pool Regulatory Analysis.Transcription of NRC Question Precedes Each Util Response + (ML20141D913)
- ML20141D914 + (ML20141D914)
- ML20141D915 + (ML20141D915)
- ML20141D917 + (ML20141D917)
- ML20141D918 + (ML20141D918)
- ML20141D920 + (ML20141D920)
- ML20141D922 + (ML20141D922)
- ML20141D923 + (ML20141D923)
- 3F0597-04, Forwards Summary Document Describing Qualification of Focused Transducer Sys Used During Refuel 10,per Request for Info in 970129 Meeting + (ML20141D924)
- ML20141D925 + (ML20141D925)
- ML20141D926 + (ML20141D926)
- ML20141D929 + (ML20141D929)
- ML20141D930 + (ML20141D930)
- ML20141D931 + (ML20141D931)
- ML20141D933 + (ML20141D933)
- ML20141D934 + (ML20141D934)
- ML20141D935 + (ML20141D935)
- ML20141D936 + (ML20141D936)
- ML20141D937 + (ML20141D937)
- ML20141D940 + (ML20141D940)
- ML20141D942 + (ML20141D942)
- IA-97-183, Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR + (ML20141D942)
- ML20141D943 + (ML20141D943)
- NSD-NRC-97-5124, Forwards Draft SSAR Markups Re Structural Related Issues. Changes Will Be Included in Rev 13 of SSAR + (ML20141D949)
- NSD-NRC-97-5127, Provides Update on Post 72-hr Design Change, & Structural & Seismic Analyses to Shield Bldg Roof + (ML20141D950)
- ML20141D951 + (ML20141D951)
- ML20141D952 + (ML20141D952)
- ML20141D956 + (ML20141D956)
- 05000285/LER-1997-002, :on 970414,charging Pump CH-1B Declared Inoperable.Caused by Ineffective Communication Re Amend 125 to TS 2.15.Implemented Improved Procedures Re Submittal of License Amend Requests + (ML20141D960)
- ML20141D962 + (ML20141D962)
- ML20141D965 + (ML20141D965)
- ML20141D968 + (ML20141D968)
- ML20141D970 + (ML20141D970)
- ML20141D972 + (ML20141D972)
- ML20141D973 + (ML20141D973)
- ML20141D974 + (ML20141D974)
- ML20141D976 + (ML20141D976)
- ML20141D978 + (ML20141D978)
- ML20141D980 + (ML20141D980)
- ML20141D981 + (ML20141D981)
- TXX-4692, Final Deficiency Rept CP-86-03 Re Sealing Techniques Used in Installation of Class 1E Instruments.Initially Reported on 860110.Seal Assemblies Provided for Class 1E Devices W/ Exception of Svc Water Intake Areas + (ML20141D983)
- ML20141D985 + (ML20141D985)
- ML20141D987 + (ML20141D987)
- ML20141D988 + (ML20141D988)
- ML20141D991 + (ML20141D991)
- ML20141D992 + (ML20141D992)