Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140D889 + (ML20140D889)
- NG-97-0946, Responds to Re Investigation Rept 3-96-002.Since Individuals Cannot Be Identified,Matter Will Be Considered Closed + (ML20140D890)
- ML20140D891 + (ML20140D891)
- ML20140D892 + (ML20140D892)
- ML20140D893 + (ML20140D893)
- ML20140D895 + (ML20140D895)
- ML20140D896 + (ML20140D896)
- ML20140D898 + (ML20140D898)
- ML20140D899 + (ML20140D899)
- ML20140D900 + (ML20140D900)
- ML20140D902 + (ML20140D902)
- ML20140D903 + (ML20140D903)
- ML20140D905 + (ML20140D905)
- ML20140D906 + (ML20140D906)
- ML20140D907 + (ML20140D907)
- B11797, Submits Schedule for Upcoming Isap Milestones,Including Collecting Info for NRC Integrated Assessment,Corrective Actions Needed as Result of Isap Evaluation Process & Completion of Ranking Process + (ML20140D909)
- ML20140D911 + (ML20140D911)
- ML20140D912 + (ML20140D912)
- 05000266/LER-1950-266, Responds to NRC Re Violations Noted in Insp Repts 50-266/97-07 & 50-301/97-07.Corrective actions:30-day Security LER 50-266/97-S01-00,was Submitted to Commission on 970304 + (ML20140D913)
- ML20140D914 + (ML20140D914)
- ML20140D916 + (ML20140D916)
- ML20140D917 + (ML20140D917)
- ML20140D918 + (ML20140D918)
- ML20140D919 + (ML20140D919)
- ML20140D921 + (ML20140D921)
- ST-HL-AE-1381, Informs of Revised Program to Assure That Design Info Input for Seismic Analyses Kept Consistent w/as-built Configuration Per IE Bulletin 79-14.Revised Program Requires safety-related Piping Sys Walkdown by Dedicated Group + (ML20140D922)
- ML20140D923 + (ML20140D923)
- ML20140D926 + (ML20140D926)
- U-602753, Discusses 970522 Inspector Exit Re 970309 Event Involving Actions by Operation Department Personnel That Were Contrary to Approved Station Procedures + (ML20140D927)
- ML20140D928 + (ML20140D928)
- ML20140D930 + (ML20140D930)
- ML20140D931 + (ML20140D931)
- B11955, Forwards Clarifying Info to Re Impact of Release of Superheated Steam from Postulated Main Steam Line Break on Environ Qualification of Equipment Located Outside Containment,Per 860108 Meeting + (ML20140D932)
- ML20140D934 + (ML20140D934)
- ML20140D935 + (ML20140D935)
- ML20140D936 + (ML20140D936)
- IR 05000410/1985048 + (ML20140D938)
- ML20140D939 + (ML20140D939)
- ML20140D941 + (ML20140D941)
- U-602747, Forwards Summary of CPS Improvement Actions & Results Completed Since Sept 1996 Plant Shutdown Following Event Involving Failure of B Reactor Recirculation Pump Seal + (ML20140D942)
- ML20140D944 + (ML20140D944)
- ML20140D945 + (ML20140D945)
- IR 05000729/2008001 + (ML20140D946)
- ML20140D948 + (ML20140D948)
- DD-84-19, Order Extending Time Until 841221 for Commission to Decide Whether to Review Directors Decisions DD-84-19 & DD-84-20. Served on 841218 + (ML20140D949)
- ML20140D950 + (ML20140D950)
- ML20140D952 + (ML20140D952)
- RBG-23-007, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-74.Corrective Actions:Records Concerning Certified Matl Test Rept Obtained from GE for Master Parts List Item C41-F004A & B,Serial Numbers 464 & 465,respectively + (ML20140D953)
- ML20140D954 + (ML20140D954)
- ML20140D955 + (ML20140D955)
- ML20140D957 + (ML20140D957)