Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138E983 + (ML20138E983)
- ML20138E984 + (ML20138E984)
- ML20138E997 + (ML20138E997)
- ML20138E999 + (ML20138E999)
- ML20138F000 + (ML20138F000)
- ML20138F002 + (ML20138F002)
- ML20138F004 + (ML20138F004)
- IR 05000333/1985020 + (ML20138F007)
- ML20138F012 + (ML20138F012)
- ML20138F016 + (ML20138F016)
- ML20138F019 + (ML20138F019)
- ML20138F022 + (ML20138F022)
- ML20138F027 + (ML20138F027)
- ML20138F034 + (ML20138F034)
- PNO-II-97-015, Re Media Interest in Evacuation of Site Environ Lab,Due to Potentially Explosive Matl.Acid Was re-established,diluted & Stored in Licensee Hazardous Matl Area for Routine Disposal + (ML20138F035)
- ML20138F044 + (ML20138F044)
- ML20138F045 + (ML20138F045)
- IR 05000219/1985026 + (ML20138F047)
- ML20138F049 + (ML20138F049)
- ST-HL-AE-1351, Informs of 851031 & 1101 Emergency Planning Conference at Facility to Coordinate Util,Fema,Nrc,State of Tx & Matagorda County Activities.Conference Agenda & Map Encl + (ML20138F052)
- ML20138F055 + (ML20138F055)
- IR 05000346/1985031 + (ML20138F056)
- ML20138F058 + (ML20138F058)
- ML20138F061 + (ML20138F061)
- ML20138F063 + (ML20138F063)
- L-96-017, TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station + (ML20138F066)
- ML20138F067 + (ML20138F067)
- ML20138F070 + (ML20138F070)
- PY-CEI-NRR-0368, Documents Commitment to Provide Rept Describing Methods Used to Establish Setpoints & Allowable Values for Reactor Protection Sys & ESF Trip Functions Assumed to Operate in FSAR Chapters 6 & 15 Analysis Per 840723 & 1009 Ltrs + (ML20138F072)
- ML20138F075 + (ML20138F075)
- ML20138F078 + (ML20138F078)
- ML20138F081 + (ML20138F081)
- ML20138F082 + (ML20138F082)
- ML20138F085 + (ML20138F085)
- 05000247/LER-1985-013, :on 851004,leakage Into Containment from All Sources Exceeded Tech Spec Limit of 10 Gpm for Combined Leakage.Source of Leakage Traced to Tube in Fan Cooler Unit Water Box.Tubing Replaced + (ML20138F086)
- ML20138F088 + (ML20138F088)
- ML20138F090 + (ML20138F090)
- ML20138F092 + (ML20138F092)
- ML20138F093 + (ML20138F093)
- ML20138F094 + (ML20138F094)
- ML20138F097 + (ML20138F097)
- ML20138F098 + (ML20138F098)
- ML20138F100 + (ML20138F100)
- ML20138F103 + (ML20138F103)
- ML20138F105 + (ML20138F105)
- 05000395/LER-1985-027, :on 850920,reactor Tripped Due to Loss of Main Feedwater Pumps During Testing of Condensate Sys.Caused by Improper Valve Lineup.Personnel Instructed & Training Program Developed + (ML20138F106)
- IR 05000802/2009016 + (ML20138F110)
- ML20138F111 + (ML20138F111)
- ML20138F117 + (ML20138F117)
- ML20138F119 + (ML20138F119)
- 05000368/LER-1985-019, :on 850913,main Steam Isolation Sys Actuated on Low Steam Generator Pressure During Plant Cooldown.Caused by Personnel Error.Sys Restored to Preactuation Condition. Personnel Counseled + (ML20138F123)