Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137E959 + (ML20137E959)
- ML20137E960 + (ML20137E960)
- 05000362/LER-1985-030-01, :on 851208,fuel Handling Isolation Sys Train B Actuated When Noble Gas Airborne Radiation Monitor 3RE-7823B Spuriously Alarmed.Caused by Radiation Monitor Sensitivity to Random Electrical Noise + (ML20137E962)
- ML20137E963 + (ML20137E963)
- ML20137E965 + (ML20137E965)
- ML20137E967 + (ML20137E967)
- ML20137E968 + (ML20137E968)
- ML20137E969 + (ML20137E969)
- ML20137E970 + (ML20137E970)
- ML20137E972 + (ML20137E972)
- 05000295/LER-1997-005, Forwards LER 97-005-00 IAW 10CFR50.73(a)(2)(i)(B).Actions Listed + (ML20137E975)
- ML20137E976 + (ML20137E976)
- ML20137E978 + (ML20137E978)
- 05000251/LER-1985-023-01, :on 850824,discovered That Containment Isolation Valve CV-4-956A Not Tested on Quarterly Cycle,Per Tech Spec 3.3.3.Caused by Failure to Note Previous Testing Problems on Valve Clearance.Valve Tested + (ML20137E979)
- ML20137E980 + (ML20137E980)
- ML20137E983 + (ML20137E983)
- PNO-III-85-071A, circuitry Mods to Plant Transformers Completed & Successfully Tested on 850819.Mods Instituted Due to Failure in Switching Mechanism in Auxiliary Main Station Transformer + (ML20137E986)
- ML20137E987 + (ML20137E987)
- ML20137E988 + (ML20137E988)
- 05000282/LER-1997-002-01, :on 970219,failed to Submit Relief Requests for Limited ISI Exams.Caused by Misinterpretation of 10CFR50.55a(g)(1).Prepared Procedure Restablishing Process to Identify,Quantify & Document ISI Exams + (ML20137E991)
- B11659, Discusses Implementation of Mods Providing Equivalent Level of Protection Required by 10CFR50,App R.Non-outage Mods Implemented.Mods in Control Room Will Be Implemented During Next Refueling Outage for Safety Reasons + (ML20137E993)
- ML20137E995 + (ML20137E995)
- ML20137E998 + (ML20137E998)
- ML20137F002 + (ML20137F002)
- ML20137F003 + (ML20137F003)
- B11643, Forwards Info Re Control Room Halon Fire Suppression Sys,In Response to 850715 Request.Total Flooding of Halon Sys Will Be Installed in Facility Control Room During Next Refueling Outage,Per 10CFR50.48 Schedule + (ML20137F006)
- ML20137F016 + (ML20137F016)
- ML20137F025 + (ML20137F025)
- ML20137F028 + (ML20137F028)
- ML20137F030 + (ML20137F030)
- ML20137F031 + (ML20137F031)
- ML20137F033 + (ML20137F033)
- LR-N970188, Submits Suppl to Response to NRC Re Violations Noted in Insp Repts 50-354/96-03 & 50-354/96-06 Cas:Design & Licensing Basis Overview Training Course Being Developed & Will Be Available to Engineering Support Personnel + (ML20137F043)
- PNO-IV-85-043, on 850820,util Achieved Criticality.Plant Had Been Shut Down Since 840910 to Replace Reactor Recirculation Piping.Licensee Has 19-day Power Ascension & Testing Period Before Resuming Commercial Operation + (ML20137F046)
- ML20137F049 + (ML20137F049)
- ML20137F052 + (ML20137F052)
- ML20137F053 + (ML20137F053)
- ML20137F056 + (ML20137F056)
- 05000271/LER-1996-026, :on 961007,fire Barrier Penetration Seal Improperly Installed in 1979.Caused by Inadequate Design Implementation & Insp.Ts Compensatory Fire Watch in Place to Support Seal Repair Work + (ML20137F057)
- A05050, Submits Licensed Operator Requalification Program Status Rept.Summary of 850628 Requalification Training Meeting Rept 50-213/85-01 Was Provided to Document Commitments Listed + (ML20137F063)
- ML20137F066 + (ML20137F066)
- ML20137F068 + (ML20137F068)
- ML20137F071 + (ML20137F071)
- ML20137F073 + (ML20137F073)
- IR 05000313/1985021 + (ML20137F077)
- ST-HL-AE-5596, Rescinds Submitted Temporary Addendum Four to Physical Security Plan,Rev 7A.Temporary Addendum Four Described Measures Taken During Const Activities Associated with Intrusion Detection Sys Upgrade Project + (ML20137F081)
- ML20137F084 + (ML20137F084)
- 05000317/LER-1997-002, :on 970220,misread TS Requirements Resulted in Inadequate Test.Caused by Lack of Strict Adherence to Wording of Plants TS Requirements.Edgs 1B,2A & 2B Were Successfully Tested & Returned to Svc + (ML20137F085)
- ML20137F088 + (ML20137F088)
- ML20137F092 + (ML20137F092)
- ML20137F095 + (ML20137F095)