Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136H110 + (ML20136H110)
- ML20136H112 + (ML20136H112)
- ML20136H113 + (ML20136H113)
- ML20136H115 + (ML20136H115)
- ML20136H116 + (ML20136H116)
- ML20136H117 + (ML20136H117)
- ML20136H119 + (ML20136H119)
- 3F0397-07, Monthly Operating Rept for Feb 1997 for Crystal River Unit 3 + (ML20136H121)
- IR 05000313/1985019 + (ML20136H123)
- BSEP-97-0034, Requests Approval for Plant to Use Alternative to ASME B&PV Code Requirements for Exam of Class 1,2 & 3 Integrally Welded Attachments + (ML20136H124)
- ML20136H126 + (ML20136H126)
- ML20136H127 + (ML20136H127)
- ML20136H128 + (ML20136H128)
- ML20136H129 + (ML20136H129)
- ML20136H130 + (ML20136H130)
- ML20136H131 + (ML20136H131)
- ML20136H133 + (ML20136H133)
- PNO-III-85-098, on 851117,between 17,000 & 35,000 Gallons of Radioactive Water Released from Ruptured Seam in Condensate Storage Tank.Water Radioactivity Less than 0.4% of Regulatory Limit for Offsite Release + (ML20136H134)
- ML20136H135 + (ML20136H135)
- ML20136H136 + (ML20136H136)
- ML20136H138 + (ML20136H138)
- ML20136H139 + (ML20136H139)
- 0CAN098508, Responds to NRC Re Violation Noted in Insp Repts 50-313/85-19 & 50-368/85-20.Corrective actions:post-accident Sampling Sys Installed & Capabilities Functional & Isolation Valves Repaired + (ML20136H140)
- ML20136H143 + (ML20136H143)
- BSEP-97-0085, Forwards ECCS Evaluation Models Which Summarizes Results & Shows Absolute Value of Changes & Errors Approx 23 F for GE7 Fuel + (ML20136H144)
- ML20136H146 + (ML20136H146)
- ML20136H147 + (ML20136H147)
- ML20136H149 + (ML20136H149)
- ML20136H150 + (ML20136H150)
- ML20136H153 + (ML20136H153)
- ML20136H154 + (ML20136H154)
- TXX-4610, Discusses Implementation of NRC 850605 Conditions for Use of ASME Code Case N-397 Re Alternative Method for Spectral Broadening & N-411 Re Alternative Damping Factors. Expeditious Approval for Use of Code Cases Requested + (ML20136H155)
- ML20136H156 + (ML20136H156)
- IR 05000311/2005017 + (ML20136H158)
- ML20136H164 + (ML20136H164)
- ML20136H166 + (ML20136H166)
- ML20136H167 + (ML20136H167)
- ML20136H168 + (ML20136H168)
- ML20136H169 + (ML20136H169)
- ML20136H171 + (ML20136H171)
- ML20136H172 + (ML20136H172)
- ML20136H174 + (ML20136H174)
- ML20136H175 + (ML20136H175)
- B16125, Responds to GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs + (ML20136H176)
- ML20136H177 + (ML20136H177)
- ML20136H179 + (ML20136H179)
- ML20136H180 + (ML20136H180)
- 05000425/LER-1997-001-03, :on 970213,surveillances Were Not Performed for Unlocked Valves.Caused by Failure of Engineering & Operations Personnel to Ensure Appropriate TS Surveillance Requirements Were Met.Afw Valves Were Locked + (ML20136H181)
- ML20136H183 + (ML20136H183)
- IR 05000282/1985021 + (ML20136H184)