Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136F032 + (ML20136F032)
- ML20136F034 + (ML20136F034)
- HBL-85-061, Submits Rept Re Investigation of Radwaste Shipments for Which Notification of Receipt Not Received within 20 Days After Transfer.Formal Notification of Receipt of 851118 & 19 Shipments Received on 851211 & 10,respectively + (ML20136F035)
- ML20136F036 + (ML20136F036)
- ML20136F037 + (ML20136F037)
- ML20136F038 + (ML20136F038)
- 05000361/LER-1985-050, :on 851018,reactor Trip on Loss of Load Occurred.Caused by Turbine Trip Generated by Spurious High Drain Tank Level on Moisture Separator Reheater T096.Failed Pipe Nipple Replaced + (ML20136F039)
- ML20136F040 + (ML20136F040)
- HBL-85-058, Cancels 851203 & 10 Advance Notifications of Nuclear Waste Shipment.Advance Notification Not Needed Since Quantity of Radioactive Matl Contained in Shipment Does Not Exceed Quantities Listed in 10CFR71.97(b)(3) + (ML20136F042)
- ML20136F044 + (ML20136F044)
- ML20136F046 + (ML20136F046)
- ML20136F047 + (ML20136F047)
- 05000348/LER-1997-001-01, :on 970206,TS Ventilation Sys Deficiencies Discovered.Caused by Cognitive Personnel Error.Applicable Procedures Addressing Inadequate Flow Test Revised & Responsible Person Coached on Event + (ML20136F048)
- ML20136F050 + (ML20136F050)
- ML20136F051 + (ML20136F051)
- ML20136F052 + (ML20136F052)
- ML20136F056 + (ML20136F056)
- ML20136F057 + (ML20136F057)
- ML20136F061 + (ML20136F061)
- ML20136F062 + (ML20136F062)
- ML20136F063 + (ML20136F063)
- ML20136F064 + (ML20136F064)
- ML20136F066 + (ML20136F066)
- ML20136F072 + (ML20136F072)
- ML20136F073 + (ML20136F073)
- 05000327/LER-1985-049-02, :on 851206,waste Gas Hydrogen & Oxygen Analyzer Monthly Functional Test Not Performed in Oct.Caused by Scheduling Methods Utilized.Scheduling Method Improved to Prevent Recurrence + (ML20136F080)
- ML20136F083 + (ML20136F083)
- ML20136F084 + (ML20136F084)
- ML20136F087 + (ML20136F087)
- ML20136F088 + (ML20136F088)
- ML20136F090 + (ML20136F090)
- ML20136F096 + (ML20136F096)
- ML20136F097 + (ML20136F097)
- ML20136F099 + (ML20136F099)
- ML20136F103 + (ML20136F103)
- ML20136F105 + (ML20136F105)
- ML20136F106 + (ML20136F106)
- ML20136F109 + (ML20136F109)
- ML20136F110 + (ML20136F110)
- ML20136F112 + (ML20136F112)
- ML20136F113 + (ML20136F113)
- ML20136F115 + (ML20136F115)
- ML20136F116 + (ML20136F116)
- ML20136F117 + (ML20136F117)
- ML20136F122 + (ML20136F122)
- ML20136F124 + (ML20136F124)
- ML20136F125 + (ML20136F125)
- ML20136F127 + (ML20136F127)
- ML20136F128 + (ML20136F128)
- PNO-II-85-109, on 851113,six Employees Received Contamination on Skin or Shoe During Scheduled Emergency Drill.Caused by Pouring Less than 1 Mci Tc-99m to Simulate Contamination. Decontamination Begun + (ML20136F133)
- ML20136F135 + (ML20136F135)